0BInvestment Evaluation Summary<br />

TNM-GS-809-0720<br />

� addresses the asset and safety issues associated with the 110 kV assets identified in section 4, in particular the<br />

110 kV voltage transformers and post insulators;<br />

� addresses other performance, reliability and design issues identified in section 4;<br />

� addresses the NER compliance issues associated with the Meadowbank–New Norfolk 110 kV transmission line<br />

protection scheme;<br />

� enables reduced outage duration and ease of implementation (refer to <strong>Appendix</strong> A for proposed implementation<br />

sequence); and<br />

� reduces the ongoing maintenance requirements and costs associated with the site.<br />

7.3.3 DRAWBACKS<br />

The option has the following drawbacks:<br />

� higher <strong>capital</strong> cost than option 2.<br />

7.3.4 CONCLUSION<br />

This option is technically viable.<br />

8 OPTION ESTIMATES<br />

A comparison of the net present value of options is provided in Table 1.<br />

Table 1 - Comparison of options considered<br />

Option Net present value of costs ($M June 2007)<br />

1 Manage existing 110 kV assets and defer replacement -$2.84<br />

2 Replace selected 110 kV assets in-situ -$2.65<br />

3 Replace all 110 kV assets in-situ -$3.37<br />

The economic analysis includes the cost impact to customers in the event of a major circuit breaker failure using a<br />

probabilistic approach based on current and forecast load data for each individual transmission circuit connected to<br />

Meadowbank Substation 110 kV.<br />

9 PREFERRED OPTION<br />

Option 2 (replacement of selected 110 kV assets) is the preferred option because it is the most cost effective solution to<br />

address the identified safety, reliability, condition and design issues at Meadowbank Substation. This approach will also<br />

minimise the number and duration of transmission circuit outages due to reduced frequency and duration of maintenance.<br />

© <strong>Transend</strong> Networks Pty Ltd 12 of 12