Table 3 – Circuit criticality ratings<br />
Circuit criticality<br />
Circuit criticality<br />
<strong>Renewal</strong> Capital Expenditure<br />
TNM-GR-809-0929<br />
Issue 1.0, January 2009<br />
Least critical Most critical<br />
1 2 3 4 5<br />
Number of circuits 7 6 5 11 24 53<br />
Percentage of total 13% 11% 9% 21% 45% 100%<br />
Figure 5 presents a comparison of the criticality of the transmission circuits that contain Reyrolle<br />
110 kV circuit breakers compared with the criticality of all transmission circuits. It shows that a<br />
large proportion of the transmission circuits that contain Reyrolle 110 kV circuit breakers tend to<br />
be critical, when compared to the entire transmission circuit population.<br />
Figure 5 – Reyrolle 110 kV circuit breaker comparison with the entire transmission circuit population<br />
600<br />
500<br />
400<br />
300<br />
200<br />
100<br />
0<br />
506<br />
Low critcality<br />
45 42<br />
7 6 5<br />
1.6 INVESTMENT DRIVERS<br />
1 2 3 4 5<br />
Criticality Index<br />
144<br />
High criticality<br />
Page 14 of 28 © <strong>Transend</strong> Networks Pty Ltd<br />
194<br />
UNCONTROLLED WHEN PRINTED<br />
11<br />
24<br />
Overall Transmission Circuit s<br />
Reyrolle Type 110/ OS Circuit Breaker<br />
This section provides a summary of the key investment drivers for the key asset categories that<br />
comprise the selected 110 kV substation redevelopment projects that have been selected for review.<br />
It is important to note that the replacement of the Reyrolle 110 kV circuit breakers is only one<br />
component of the investment need and that the timing for each of the projects is driven by a range<br />
of asset management issues. A summary of the key assets that need to be replaced as part of the<br />
110 kV substation redevelopments are presented in <strong>Appendix</strong> A1. <strong>Appendix</strong> A highlights the<br />
particular asset categories for each transmission circuit that have been identified as being in poor<br />
condition and need to be replaced.<br />
1.6.1 Supply transformers<br />
The only 110 kV substation redevelopment project that includes the replacement of a supply<br />
transformer is the Arthurs Lake Substation redevelopment project. The Arthurs Lake Substation<br />
Condition Assessment Report (TNM-CA-809-0596) assesses the condition of the three singlephase<br />
transformers currently in service at Arthurs Lake Substation and also the identical singlephase<br />
system spare unit. The report has identified that the single-phase transformers:<br />
Total