Table 3 – Circuit criticality ratings<br />

Circuit criticality<br />

Circuit criticality<br />

<strong>Renewal</strong> Capital Expenditure<br />

TNM-GR-809-0929<br />

Issue 1.0, January 2009<br />

Least critical Most critical<br />

1 2 3 4 5<br />

Number of circuits 7 6 5 11 24 53<br />

Percentage of total 13% 11% 9% 21% 45% 100%<br />

Figure 5 presents a comparison of the criticality of the transmission circuits that contain Reyrolle<br />

110 kV circuit breakers compared with the criticality of all transmission circuits. It shows that a<br />

large proportion of the transmission circuits that contain Reyrolle 110 kV circuit breakers tend to<br />

be critical, when compared to the entire transmission circuit population.<br />

Figure 5 – Reyrolle 110 kV circuit breaker comparison with the entire transmission circuit population<br />

600<br />

500<br />

400<br />

300<br />

200<br />

100<br />

0<br />

506<br />

Low critcality<br />

45 42<br />

7 6 5<br />

1.6 INVESTMENT DRIVERS<br />

1 2 3 4 5<br />

Criticality Index<br />

144<br />

High criticality<br />

Page 14 of 28 © <strong>Transend</strong> Networks Pty Ltd<br />

194<br />

UNCONTROLLED WHEN PRINTED<br />

11<br />

24<br />

Overall Transmission Circuit s<br />

Reyrolle Type 110/ OS Circuit Breaker<br />

This section provides a summary of the key investment drivers for the key asset categories that<br />

comprise the selected 110 kV substation redevelopment projects that have been selected for review.<br />

It is important to note that the replacement of the Reyrolle 110 kV circuit breakers is only one<br />

component of the investment need and that the timing for each of the projects is driven by a range<br />

of asset management issues. A summary of the key assets that need to be replaced as part of the<br />

110 kV substation redevelopments are presented in <strong>Appendix</strong> A1. <strong>Appendix</strong> A highlights the<br />

particular asset categories for each transmission circuit that have been identified as being in poor<br />

condition and need to be replaced.<br />

1.6.1 Supply transformers<br />

The only 110 kV substation redevelopment project that includes the replacement of a supply<br />

transformer is the Arthurs Lake Substation redevelopment project. The Arthurs Lake Substation<br />

Condition Assessment Report (TNM-CA-809-0596) assesses the condition of the three singlephase<br />

transformers currently in service at Arthurs Lake Substation and also the identical singlephase<br />

system spare unit. The report has identified that the single-phase transformers:<br />

Total