26.03.2013 Views

Civil Engineering Project Management (4th Edition)

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

xii Contents<br />

17.10 Delay claims 217<br />

17.11 Estimating delay costs 218<br />

17.12 Quotations from a contractor for undertaking variations 219<br />

17.13 Time limits and interest payable on late payments 220<br />

17.14 Adjudication 221<br />

17.15 Alternative dispute resolution 222<br />

17.16 Arbitration 223<br />

17.17 Minimizing claims and disputes 223<br />

18 Earthworks and pipelines 225<br />

18.1 Excavating and earth-placing machinery 225<br />

18.2 Controlling excavation 227<br />

18.3 Haulage of excavated material 228<br />

18.4 Placing and compacting fill 229<br />

18.5 Watching fill quality 230<br />

18.6 Site roads 231<br />

18.7 Trenching for pipelines 232<br />

18.8 Thrust blocks and testing pipelines 233<br />

18.9 Handling and jointing large pipes and fittings 234<br />

19 Site concreting and reinforcement 236<br />

19.1 Development of concrete practice 236<br />

19.2 Standards for concrete quality 238<br />

19.3 Practical compliance with concrete standards 240<br />

19.4 Grading of aggregates and their suitable mixing 242<br />

19.5 Workability of concrete and admixtures 243<br />

19.6 Practical points in producing good concrete 245<br />

19.7 Some causes of unsatisfactory concrete test results 247<br />

19.8 Site checks on concrete quality 248<br />

19.9 Conveyance and placing of concrete 250<br />

19.10 Construction and other joints 251<br />

19.11 Concrete finish problems 252<br />

19.12 Handling and fixing steel reinforcement 253<br />

References 256<br />

Index 257

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!