26.03.2013 Views

Civil Engineering Project Management (4th Edition)

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Plate 6b. Steel piling sometimes<br />

does not go where the civil<br />

engineer thinks it has – especially<br />

when he was not aware the<br />

ground contained boulders or<br />

other obstructions<br />

Plate 6a. A problem for the designer<br />

under the Construction (Design and<br />

<strong>Management</strong>) Regulations 1994 who<br />

has to pay ‘adequate regard to the<br />

need to avoid foreseeable risks’ (see<br />

p. 107 et seq.). The designer may decide<br />

a stable berm should be cut into the<br />

hillside before the pipe trench is<br />

excavated

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!