26.03.2013 Views

Civil Engineering Project Management (4th Edition)

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Design options 24 et seq.<br />

Design and construct options 4, 24<br />

contract conditions for 42<br />

variations under 219<br />

Design, build and operate (DBO)<br />

contracts 4, 25, 32<br />

Design completion before tendering<br />

desirability 69, 223<br />

Dewatering site 142<br />

Direct labour construction 20<br />

undertaken by consultant 21<br />

Drawings 54, 97, 99<br />

need to destroy those superseded 162<br />

record 162<br />

register of 147<br />

resident engineer’s checking 92–3<br />

Earth filling 229–31<br />

achieving optimum moisture<br />

content 230<br />

compaction factor influence 230<br />

in situ tests 137<br />

watching fill quality 230–1<br />

EC procurement regulations 15<br />

EC rules on tendering 65–7<br />

ECC Conditions, provisions of 43–4, 91<br />

delay cost assessment 219<br />

project manager under 10, 52, 104<br />

variations and claims 104, 209,<br />

215, 220<br />

weather definition 218<br />

Egan report 8<br />

Employer’s representative or project<br />

manager 42, 46<br />

under ECC conditions 10, 43–4,<br />

52, 91, 104<br />

Employer’s:<br />

discussions with resident<br />

engineer 125–6<br />

limit on variations 91, 208<br />

role under contract 51, 89<br />

Engineer:<br />

duties under ICE conditions 89,<br />

91–2, 94<br />

employer appoints 89<br />

issue of variation orders 206<br />

limits to powers 91–2<br />

need to consult employer on claims 45,<br />

91–2, 206–7<br />

provides all design drawings 92<br />

role under contract 41, 51<br />

safety responsibilities 100<br />

Engineer, procure and construct (EPC)<br />

contracts 26<br />

<strong>Engineering</strong> & Construction Contract,<br />

see ECC<br />

Excavating and earth placing machinery<br />

225–7<br />

Excavation:<br />

bulking factors 229<br />

formation trimming 227<br />

spoil haulage problems 228<br />

Excavation measurement:<br />

billing problems 182–4<br />

in rock 183, 184<br />

working space problems 185<br />

Ex-contractual payments 34<br />

Extensions of time 175, 217–18<br />

Extra bill items policy 152, 198–9<br />

Extranet systems 12<br />

Extras, avoidance of interest<br />

charges 220–1<br />

Facilities management 10<br />

Fast completion requirements 69, 224<br />

Feasibility studies:<br />

importance of 17, 18, 50<br />

data check requirements 18<br />

FIDIC conditions 2, 45, 48, 89<br />

cash flow estimate needed 171<br />

employer to be consulted on<br />

claims 206<br />

engineer’s powers under 51, 92<br />

for M & E work 48<br />

payment time allowed 197<br />

prequalification standard form 68<br />

subcontracting restraints 86<br />

Foundation bearing value 136<br />

Framework agreements 11<br />

FRPO sheets (for record purposes<br />

only) 155, 213<br />

Gateway process 15<br />

Grading apparatus for soils 137<br />

Ground data to be provided 60–1<br />

Index 259<br />

Haulage roads 138<br />

Haulage economics 228–9<br />

Health & Safety Executive 108<br />

code of practice 110, 111–12<br />

notification requirements 108<br />

Health & Safety regulations 107 et seq.<br />

1994 construction (CDM)<br />

regulations 107<br />

1996 construction (welfare)<br />

regulations 115

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!