26.03.2013 Views

Civil Engineering Project Management (4th Edition)

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Plate 11a. An early photo of congested pipework being built in the base of a shaft,<br />

taking more than a week to complete. Hard hats must now be worn.<br />

Plate 11b. A sophisticated gantry for handling and placing pre-cast concrete bridge and<br />

other units. Ghazi Barotha Hydropower project, Pakistan 2001

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!