26.03.2013 Views

Civil Engineering Project Management (4th Edition)

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Acceptance of tender 76<br />

ACE (Assn. Consulting Engineers)<br />

Agreement form 49<br />

Adjudication 6, 44, 221<br />

Adjustment item to tender price 73, 194<br />

payment of 200<br />

Agent 10, 80<br />

ability to progress job 174<br />

appointment to be approved 120<br />

performance problems 102–4<br />

relationship with resident engineer<br />

102, 149<br />

Alliancing 14<br />

Alternative dispute resolution (ADR) 222<br />

Analysis of tenders 73–5<br />

Arbitration 223<br />

Bar charts 167–70<br />

Bills of quantities, see Measurement and<br />

bills of quantities<br />

Benchmarking 14<br />

Best value contracts 14<br />

Bond and insurance 54, 204<br />

Bonus payments 33<br />

Budget estimate 33, 176<br />

Building work:<br />

billing quantities for 183<br />

brickwork measurement 187<br />

use of JCT contract 46<br />

use of management contractor 23<br />

use of subcontractors 86<br />

Build, own and operate<br />

contracts 5, 10, 13<br />

Cash flow forecasts:<br />

effect on costs 74<br />

FIDIC requirement for 171<br />

forecasting of 170<br />

CDM safety regulations 93, 107, 110<br />

Certificates for payment 196<br />

<strong>Civil</strong> engineering method of measurement<br />

CESMM 179–81, 183–4, 187, 191<br />

problems with 181–2<br />

Index<br />

Claims 206, 212<br />

alleged omission bill item 212<br />

avoidance of interest<br />

charges 196, 199, 220<br />

CVIs used as claims 212, 213<br />

delay claims 217–19<br />

disputed rates or prices 212<br />

disruption and uneconomic<br />

working 212, 218<br />

employer to be informed 206, 216<br />

for unforeseen conditions 212, 214–16<br />

for working space 185<br />

FRPO sheets, difficulty with 213<br />

importance of inspectors’ records 149,<br />

215<br />

policy if many submitted 103<br />

timing of 212, 217, 220<br />

Claims and disputes arising from:<br />

contractor’s use of subcontractors 86<br />

design changes 35<br />

incomplete drawings before<br />

tendering 69<br />

use of nominated subcontractors 166<br />

Claims and disputes, minimization<br />

of 69, 223<br />

Commissioning methods<br />

construction options 20–2<br />

design options 19<br />

design and construct options 24<br />

Compaction test apparatus 137<br />

Compensation event (under ECC) 44,<br />

209, 215, 218<br />

Competitive dialogue 14<br />

Completion 175<br />

effect on time-related charges 199–200<br />

contractor’s offer to complete early 76<br />

Computer use 11–12<br />

for contractor’s accounting 85<br />

for critical path planning 217<br />

Conciliation procedure 222<br />

Concrete 236 et seq.<br />

admixtures 238<br />

aggregate grading 242, 244<br />

alkali–silica reaction 246

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!