28.10.2014 Views

CDOT Performance Data Business Plan - Cambridge Systematics

CDOT Performance Data Business Plan - Cambridge Systematics

CDOT Performance Data Business Plan - Cambridge Systematics

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Appendices<br />

The following question was presented to the group and their responses follow:<br />

“What do you hope to gain from the study and what can you contribute?”<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

To unify data collection across <strong>CDOT</strong><br />

Bring connection to SAP<br />

Revenue forecasting and resource allocation,<br />

Would like to see higher-level organizational measures and results for management.<br />

Quality of measures across the stewardship agreement<br />

Chief Objectives reports<br />

Mentioned Transport software<br />

Interested in mobility, congestion, and speed data<br />

Would like to see delay added as a measure<br />

Track risk management associated with human resources<br />

Have information on audit compliance reviews and Efficiency, Accountability Committee<br />

Interested in data governance (who owns the data?)<br />

Roles and responsibilities, collect once using a linear referencing system to share<br />

information, and mobility performance measures<br />

Benefit/cost measures in the region<br />

Use performance measures to see where we are and where we are going<br />

Impacts of investments and outcomes (10 and 20 years in the future)<br />

A vital few measures is desirable, however need to be able to drill down to ones that are<br />

more detailed<br />

Would like to see concrete measures – subjective rather than objective<br />

Would like in real time for making decisions<br />

Would like better coordination and streamlining of data and performance measures, to be<br />

accessible for long range planning and sharing with all parties<br />

Maintenance performance-based budget<br />

Would like to see Department be more efficient in reporting data, more standard/universal<br />

methods to report and avoid variations,<br />

<strong>CDOT</strong> spends a lot of time on PMs, needs to be more efficient<br />

Measures and reports frequently, would like to see reduction in redundancy of data (i.e.<br />

both Maintenance and Pavement collecting the same data items)<br />

Not every lane mile may be necessary for pavement data collection<br />

Should optimize among departments (i.e. run the same data collection van)<br />

Would like to figure out best method to obtain information from engineers<br />

Use for formulating budgets, analysis, refining strategic plans<br />

Would like a repository/library for information to reside in and standard ways to report<br />

Would like to see performance measures drill down from the highest level (Strategic <strong>Plan</strong>)<br />

to the IPO level so employees have a “line of site” between them<br />

Need performance measures to help track what we should do in 2013, 2015, etc.<br />

Would like to see all reports in SAP<br />

An external style guide would be appropriate<br />

Agreement on valued measures<br />

<strong>Cambridge</strong> <strong>Systematics</strong>, Inc. D-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!