28.10.2014 Views

CDOT Performance Data Business Plan - Cambridge Systematics

CDOT Performance Data Business Plan - Cambridge Systematics

CDOT Performance Data Business Plan - Cambridge Systematics

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>CDOT</strong> <strong>Performance</strong> <strong>Data</strong> <strong>Business</strong> <strong>Plan</strong><br />

Additional Notes: RSL is defined as the number of years remaining until<br />

reconstruction is necessary. A pavement segment’s RSL is estimated based on<br />

pavement age, traffic volumes, climate zone, cracking distress, rut depth, and<br />

smoothness as measured by IRI.<br />

IRI is a measurement of pavement smoothness, and reflects how the traveling<br />

public experiences a roadway. The recommended thresholds for good/fair/poor<br />

for IRI are based on thresholds being considered by AASHTO and FHWA as part<br />

of a national performance monitoring program.<br />

RSL is a holistic representation of pavement condition based upon age,<br />

environment, distress deterioration rates, and the user's perspective as<br />

represented by IRI. Combining RSL with IRI elevates the importance of the<br />

user's perspective. However, <strong>CDOT</strong> may want to adjust the weight associated<br />

with each component. The current proposal is to weight them both equally. If<br />

the public surveys indicate willingness for less than perfect pavement, RSL<br />

should be weighted higher than IRI.<br />

ADLP is a tool maintained by the pavement group. Output from the ADLP is<br />

stored in an access database and/or spreadsheet, and imported into the<br />

pavement management system.<br />

4. Roadside Condition<br />

Existing Measure: Nine measures are tracked and combined to provide an<br />

Overall Maintenance Level of Service grade at <strong>CDOT</strong>.<br />

Recommendation: Recommended modification to the existing measure is to<br />

combine the LOS grades for the Roadside Facilities and Roadside Appearance<br />

Maintenance Programs into a new measure of roadside condition.<br />

Current Value:<br />

Value Based on Recommendation: B+<br />

Owner: B.J. McElroy<br />

Roadside Facilities B+ / Roadside Appearance B<br />

Required <strong>Data</strong> Item Source Owner<br />

Roadside Facilities LOS<br />

Roadside Appearance LOS<br />

Roadside Facilities expenditures from<br />

previous year<br />

Roadside Appearance expenditures<br />

from previous year<br />

BPS Module of SAP (source will be<br />

PBF, when complete)<br />

BPS Module of SAP (source will be<br />

PBF, when complete)<br />

BPS Module of SAP<br />

BPS Module of SAP<br />

Operations and Maintenance Division<br />

Operations and Maintenance Division<br />

Operations and Maintenance Division<br />

Operations and Maintenance Division<br />

3-12 <strong>Cambridge</strong> <strong>Systematics</strong>, Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!