28.10.2014 Views

CDOT Performance Data Business Plan - Cambridge Systematics

CDOT Performance Data Business Plan - Cambridge Systematics

CDOT Performance Data Business Plan - Cambridge Systematics

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>CDOT</strong> <strong>Performance</strong> <strong>Data</strong> <strong>Business</strong> <strong>Plan</strong><br />

Organizational <strong>Performance</strong><br />

7. On Time Construction<br />

Existing Measure: The percent of construction projects being delivered on time<br />

is currently tracked and reported by <strong>CDOT</strong> and included in the Chief Engineer’s<br />

Objectives and the FHWA-<strong>CDOT</strong> stewardship agreement. <strong>CDOT</strong> is moving<br />

towards defining "on time" delivery as occurring when a project is completed<br />

within the period specified in the contract after the pre-construction conference.<br />

Recommendation: Recommended modification to this measure is to assign a<br />

letter grade based on the thresholds below.<br />

A potential alternative for this measure is to base it on information provided in<br />

the Statewide Transportation Improvement Program (STIP). Measuring against<br />

the STIP would enable <strong>CDOT</strong> to assess performance against the public’s<br />

expectations, which are often established by the project timing information<br />

provided in the STIP. Options include using a project’s original completion year,<br />

as first specified in the STIP as the definition of on time; and assessing the degree<br />

to which progress has been made on a project in each year specified in the STIP.<br />

Letter grades are based on the following thresholds for percent of on time<br />

projects:<br />

Grade<br />

Threshold<br />

A 90 – 100<br />

B 80 – 89<br />

C 70 – 79<br />

D 60 – 69<br />

F < 60<br />

Current Value: 72.2%<br />

Value Based on Recommendation:<br />

Owner: Scott McDaniel<br />

C<br />

Required <strong>Data</strong> Item Source Owner<br />

Project identifier for projects completed in previous<br />

quarter<br />

SAP Projects System Module<br />

Completion date for each project SAP Projects System Module TBD<br />

Project completion data specified in the contract after SAP Projects System Module<br />

TBD<br />

the pre-construction period for each project<br />

TBD<br />

Unit of Measure: Grade<br />

3-18 <strong>Cambridge</strong> <strong>Systematics</strong>, Inc.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!