CDOT Performance Data Business Plan - Cambridge Systematics
CDOT Performance Data Business Plan - Cambridge Systematics
CDOT Performance Data Business Plan - Cambridge Systematics
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>CDOT</strong> <strong>Performance</strong> <strong>Data</strong> <strong>Business</strong> <strong>Plan</strong><br />
3.4 RECOMMENDED MEASURES<br />
This section recommends a set of priority performance measures. The measures<br />
were chosen based on stakeholder input, public priorities, and alignment with<br />
goals. Taken collectively, they can provide a comprehensive status report for the<br />
public, help to communicate agency priorities and progress, and enhance<br />
transparency and accountability.<br />
Table 3.2 summarizes the measures and categorizes them into tiers. Tier 1<br />
measures require no further work, while Tier 2 measures have issues that need to<br />
be resolved before implementation. In most cases, the issues reflect options and<br />
suggestions by <strong>CDOT</strong> staff that are not consistent with the recommendations<br />
presented below.<br />
Table 3-2<br />
Summary of Measures<br />
# Measure Tier Issues Recommendations<br />
1 Number of fatalities 2 Determine if measure should reflect a Report a count rather than a rate.<br />
rate (fatalities per 100 million VMT) or a<br />
count.<br />
Determine if measure should be<br />
Report measure for <strong>CDOT</strong> roadways.<br />
reported for the entire state or for <strong>CDOT</strong><br />
roadways.<br />
Determine if measure should reflect Focus measure on fatalities<br />
injuries in addition to fatalities.<br />
Determine if measure should reflect an Use a 5-year average<br />
annual value or a 5-year average.<br />
2 Bridge condition 1<br />
3 Pavement condition 2 Determine if the measure should include Combine remaining service life with IRI<br />
an IRI component.<br />
4 Roadside condition 2 Determine the preferred scope of this<br />
measure – the entire maintenance<br />
program, the Commission’s priorities, or<br />
roadside condition.<br />
Focus measure on roadside conditions<br />
5 Snow and ice<br />
control<br />
6 Roadway<br />
congestion<br />
7 On time<br />
construction<br />
8 On budget<br />
construction<br />
9 Strategic action item<br />
implementation<br />
1<br />
2 Add measures on delay and travel time<br />
reliability.<br />
1<br />
2 Determine if this measure should be<br />
considered as a priority measure and<br />
reported externally.<br />
Include measure in external reports<br />
2 Identify actions items to monitor. Tie this measure to actions identified in<br />
<strong>CDOT</strong>’s strategic plan and/or long<br />
range plan.<br />
<strong>Cambridge</strong> <strong>Systematics</strong>, Inc. 3-7