28.10.2014 Views

CDOT Performance Data Business Plan - Cambridge Systematics

CDOT Performance Data Business Plan - Cambridge Systematics

CDOT Performance Data Business Plan - Cambridge Systematics

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>CDOT</strong> <strong>Performance</strong> <strong>Data</strong> <strong>Business</strong> <strong>Plan</strong><br />

Table 3-5 describes the data sources (reports) that were referenced to calculate<br />

the measures. <strong>CDOT</strong> typically reports measure results in an annual performance<br />

report.<br />

Table 3-5<br />

Report Sources<br />

Measure DATA SOURCE LOCATION<br />

Number of Fatalities<br />

Bridge Condition<br />

Pavement Condition<br />

Roadside Condition<br />

Snow and Ice Control<br />

FARS website<br />

% Good/Fair available in <strong>CDOT</strong><br />

Annual <strong>Performance</strong> Report<br />

% Good/Fair based on RSL available<br />

in <strong>CDOT</strong> Annual <strong>Performance</strong> Report<br />

IRI not available<br />

available in <strong>CDOT</strong> Annual<br />

<strong>Performance</strong> Report<br />

available in <strong>CDOT</strong> Annual<br />

<strong>Performance</strong> Report<br />

Reports for 2007 through 2010<br />

available on <strong>CDOT</strong> website as PDF<br />

Reports for 2007 through 2010<br />

available on <strong>CDOT</strong> website as PDF<br />

Reports for 2007 through 2010<br />

available on <strong>CDOT</strong> website as PDF<br />

Reports for 2007 through 2010<br />

available on <strong>CDOT</strong> website as PDF<br />

Roadway Congestion 2010-Urban-Rural-summary.xlsx. Provided by <strong>CDOT</strong><br />

On Time Construction<br />

Chief Engineer’s Objectives Final Provided by <strong>CDOT</strong><br />

Report<br />

On Budget Construction<br />

Chief Engineer’s Objectives Final Provided by <strong>CDOT</strong><br />

Report<br />

Strategic Action Item Implementation TBD TBD<br />

The following diagram shows the general flow of data among <strong>CDOT</strong> systems<br />

and databases to generate the performance results.<br />

<strong>Cambridge</strong> <strong>Systematics</strong>, Inc. 3-23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!