28.10.2014 Views

CDOT Performance Data Business Plan - Cambridge Systematics

CDOT Performance Data Business Plan - Cambridge Systematics

CDOT Performance Data Business Plan - Cambridge Systematics

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>CDOT</strong> <strong>Performance</strong> <strong>Data</strong> <strong>Business</strong> <strong>Plan</strong><br />

Current Value: NA<br />

Owner: Gary Vansuch<br />

Required <strong>Data</strong> Item Source Owner<br />

TBD TBD TBD<br />

Unit of Measure: Grade<br />

Calculation:<br />

1. Identify priority policies and/or action items that should be tracked.<br />

2. Categorize each item using the scale above.<br />

3. Calculate the measure as follows:<br />

# <br />

100<br />

# <br />

4. Convert the result to letter grade<br />

Update Frequency:<br />

Quarterly<br />

The following table summarizes the results of all measures.<br />

Table 3-3 Summary of Results for 2010<br />

# Measure Current Value<br />

Value Based on<br />

Recommendation<br />

1 Number of fatalities 1.01 per 100 mil VMT 542<br />

2 Bridge condition 94.5% A<br />

3 Pavement condition 48% F<br />

4 Roadside condition B+ / B B+<br />

5 Snow and ice control C+ C+<br />

6 Roadway congestion R 8.4% cong / U 45.5% cong A / F<br />

7 On time construction 72.2% C<br />

8 On budget construction 92.9% A<br />

9 Strategic action item<br />

implementation<br />

NA<br />

NA<br />

<strong>Cambridge</strong> <strong>Systematics</strong>, Inc. 3-21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!