09.01.2015 Views

Environmental Impact Statement - Sonoma Land Trust

Environmental Impact Statement - Sonoma Land Trust

Environmental Impact Statement - Sonoma Land Trust

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table ES-1. Continued Page 2 of 1412<br />

<strong>Impact</strong> Significance Determination Mitigation Measure<br />

Surface Water Hydrology, Tidal Hydraulics, and Sedimentation<br />

No-Action Alternative<br />

No <strong>Impact</strong><br />

Proposed Project/Full-Tidal Alternative<br />

<strong>Impact</strong> HYD-1: Potential <strong>Impact</strong>s from Tidal<br />

Flooding.<br />

<strong>Impact</strong> HYD-2: Potential Erosion and Sedimentation<br />

<strong>Impact</strong>s in the Tidal Basin.<br />

<strong>Impact</strong> HYD-3: Potential Changes in Tolay Creek<br />

Flood Risk.<br />

Less than Significant None Required N/A<br />

Less than Significant<br />

Less than SignificantBeneficial<br />

<strong>Impact</strong><br />

None RequiredMitigation Measure HYD-<br />

MM-1: Implement Erosion Protection<br />

Measures<br />

None Required<br />

<strong>Impact</strong> HYD-4: Consistency with Flood Zoning No <strong>Impact</strong> None Required N/A<br />

<strong>Impact</strong> HYD-5: Modification to San Pablo Bay Tidal<br />

Circulation<br />

<strong>Impact</strong> HYD-6: Modification to Tolay Creek<br />

Morphology and Sedimentation Processes<br />

<strong>Impact</strong> HYD-7: Modification to San Pablo Bay<br />

Morphology and Sedimentation Processes.<br />

Less than Significant None Required N/A<br />

Proposed Project: Significant and<br />

Unavoidable (Option 1 & 2)<br />

Less than Significant (Option 3)<br />

Full-Tidal: Significant<br />

Proposed Project: None Proposed (Option 1<br />

& 2); None Required (Option 3)<br />

Full Tidal: Mitigation Measure HYD-MM-<br />

2: Expand Tolay Creek Widening and<br />

Deepening to1: Avoid<br />

IncreasedUnacceptable Levels of Tidal<br />

Muting. in Tolay Creek<br />

Less than Significant None Required N/A<br />

Significance Determination<br />

with Mitigation Incorporation<br />

Less than SignificantN/A<br />

N/A<br />

Proposed Project:<br />

Significant and Unavoidable<br />

(Option 1 &2); N/A (Option<br />

3)<br />

Full-Tidal: Less than<br />

Significant

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!