09.01.2015 Views

Environmental Impact Statement - Sonoma Land Trust

Environmental Impact Statement - Sonoma Land Trust

Environmental Impact Statement - Sonoma Land Trust

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table ES-1. Continued Page 13 of 1412<br />

<strong>Impact</strong> Significance Determination Mitigation Measure<br />

Proposed Project/Full-Tidal Alternative<br />

<strong>Impact</strong> CR-1: Damage or Destruction of<br />

Archaeological Resources.<br />

<strong>Impact</strong> CR-2: Destruction of Significant Historic<br />

Resource (Dickson Ranch)<br />

Aesthetics<br />

No-Action Alternative<br />

No <strong>Impact</strong><br />

Proposed Project/Full-Tidal Alternative<br />

<strong>Impact</strong> AE-1: Changes in Views from a designated<br />

Scenic Corridor<br />

<strong>Impact</strong> AE-2: Temporary changes in Visual Character<br />

of the Project Site<br />

<strong>Impact</strong> AE-3: Permanent changes in Visual Character<br />

of the Project Site<br />

<strong>Impact</strong> AE-4: Permanent obstruction of Existing<br />

Public Views of the Project Site<br />

Significant<br />

Significant Less than significant<br />

Proposed Project: Less than<br />

Significant<br />

Full-Tidal: Significant and<br />

Unavoidable<br />

Mitigation Measure CR-MM-1a: Conduct<br />

Pre-Construction Cultural Resources<br />

Surveys and Required Consultation for any<br />

Areas that Have Not Previously been<br />

Surveyed.<br />

Mitigation Measure CR-MM-1b: Stop<br />

Work if Buried Cultural Resources are<br />

Discovered Inadvertently.<br />

Mitigation Measure CR-MM-21c: Stop<br />

Work if Human Remains are encountered<br />

during Construction Activities.<br />

Mitigation Measure CR-MM-3: Document<br />

the Dickson RanchNone Required<br />

Proposed Project: None Required<br />

Full-Tidal: None Proposed<br />

Less than Significant None Required N/A<br />

Less than Significant None Required N/A<br />

Proposed Project: Less than<br />

Significant<br />

Full-Tidal: Significant and<br />

Unavoidable<br />

Proposed Project: None Required<br />

Full-Tidal: None Proposed<br />

Significance Determination<br />

with Mitigation Incorporation<br />

Less than Significant<br />

Significant and Unavoidable<br />

<strong>Impact</strong>N/A<br />

Proposed Project and Full-<br />

Tidal: N/A<br />

Full-Tidal: Significant and<br />

Unavoidable<br />

Proposed Project and Full-<br />

Tidal: N/A<br />

Full-Tidal: Significant and<br />

Unavoidable

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!