California Department of Fish and Game<br />

U.S. Fish and Wildlife Services<br />

Section 3.10. Traffic and Transportation<br />

Construction Personnel Vehicle Traffic<br />

The construction team includes equipment operators, support staff, forepersons,<br />

supervisors, safety, and inspection personnel. These persons generally arrive and<br />

depart the construction site each day in personal or company-issued vehicles. On<br />

typical projects, 70% of the crew vehicles are pickup trucks or SUVs and the rest<br />

are small to mid-sized cars.<br />

During the greatest level of construction activity, it is assumed that as many as 50<br />

construction personnel would be required during site grading activities early in<br />

Project phasing. An additional 5 miscellaneous personnel vehicles have also been<br />

factored in to account for any contingencies that may occur during Project<br />

construction. Based on this assumption and as shown in Table 3-10-2, it is<br />

estimated that as many as 55 daily round trips would be generated by personnel<br />

vehicles on a daily basis during initial site preparation.<br />

Table 3-10-2. Trip Generation Estimates for Worst-Case Project-Related<br />

Construction Traffic<br />

Vehicle Type Vehicle Number Trip Frequency Total Round Trips<br />

Site Grading<br />

Fuel Service Truck 2 1 round trip/day 2<br />

Sanitary Truck 1 1 round trip/day 1<br />

Delivery Trucks 4 1 round trip/day 4<br />

CoreNew Levee<br />

Dump Trucks 6 1 round trip/hr per<br />

8 hours<br />

Building Demolition<br />

Dump Trucks 6 1 round trip/hr per<br />

8 hours<br />

Personnel Vehicles<br />

Miscellaneous<br />

48<br />

48<br />

50 1 round trip/day 50<br />

Trucks 5 1 round trip/day 5<br />

Passenger vehicles 5 1 round trip/day 5<br />

Total Trips 163<br />

Sears Point Wetland and Watershed Restoration<br />

Project Final <strong>Environmental</strong> <strong>Impact</strong><br />

Report/<strong>Environmental</strong> <strong>Impact</strong> <strong>Statement</strong><br />

3.10-10<br />

April 2012<br />