Table 2-2. Continued Page 3 of 4<br />

Utility Relocation<br />

Bay Trail System<br />

Other Upland AreasNorth Parcel<br />

Seasonal Wetland Enhancement<br />

Partial-Tidal Wetland Restoration<br />

(Proposed Project)<br />

Construct a low berm along edge of existing road<br />

Relocate existing above-ground utility infrastructure<br />

south of the SMART rail line<br />

Implement the highest priority one of the following Trail<br />

System Options<br />

Trail System Option Segments 1 and 5 as funding<br />

becomes available. In addition,<br />

Construct all five of the proposed trail segments<br />

(Segments 1, 2, 3, 4, and 5).<br />

Trail System Option 2<br />

Cconstruct one or more additional all five of the<br />

proposed trail segments (Segments 1, 2, 3, and 4, and 5)<br />

when funded. I, but f required by the resource agencies<br />

potentially close Segment 1 during critical breeding<br />

seasons for the California clapper rail and California<br />

black rail<br />

Trail System Option 3<br />

Construct Segments 2 through 5<br />

Implement the Grazing Plan for the 1,060 acres of<br />

cattle grazing land.Modify 40 acres of bottomland<br />

diked baylands to become a seasonal marsh and pond<br />

Construct a berm and subsurface cutoff wall at the<br />

north end of the enhancement area<br />

Install a storm water pump in and plant willow stakes<br />

in an existing drainage ditch (D-1)<br />

Construct a new drainage ditch that connects culvert<br />

C-24 to the existing ditch D-1<br />

Full Tidal Alternative<br />

Relocate existing above-ground utility infrastructure south of the<br />

SMART rail lineSame as proposed project and protect or relocate<br />

utility infrastructure between Highway 37 and the SMART rail<br />

line<br />

When funding becomes available, construct one or more trail<br />

segments (Segments 2, 3, and 4). Segments 1 and 5 would not be<br />

constructed under this alternative. Construct all five of the<br />

proposed trail segments (Segments 1, 2, 3, 4, and 5).<br />

Same as proposed project