01.12.2012 Views

Temperature - European Investment Bank

Temperature - European Investment Bank

Temperature - European Investment Bank

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WEST AFRICAN POWER POOL (WAPP) PÖYRY ENERGY LTD.<br />

Mount Coffee HPP ESIA and RAP 2012-09-18<br />

ESIA Report Page 86<br />

Table 12-2: Wetlands of international importance<br />

No Wetlands Type Region Surface area Coordinates<br />

1 Gbedin Inland swamp Nimba 25 ha 07°16’N, 008°48’W<br />

2 Kpatawee Inland riverine Bong 835 ha 07°07’N, 009°38’W<br />

3 Lake Piso Costal lacustrine Singe 76’091 ha 06°45’N, 011°13’W<br />

4 Marshall Inland riverine Margibi 12’168 ha 06°08N, 010°22’W<br />

5 Mesurado Coastal Montserrado 6’706 ha 06°18’N, 010°45’W<br />

6 Lake Sheperd Coastal Maryland 18’000 ha<br />

7 Bafu Bay Coastal Sinoe 11’900 ha<br />

8 Cestos- Sankwehn Inland riverine Sinoe 15’000<br />

Source: NBSAP 2004, UNEP 2007<br />

The following map shows the protected areas as well as the areas of high biodiversity.<br />

The Mt. Coffee HPP is not located in, or near a protected area or a biodiversity priority<br />

site. The closest site is the Mesurado Wetland, which is located near the estuary of St<br />

Paul river.<br />

12.2 Conclusions<br />

Mt. Coffee HPP<br />

Figure 12-1: Biodiversity priority sites and national protected areas<br />

Source: UNEP, 2004, Desk Study on the Environment in Liberia<br />

Since the Project will not affect any of the protected areas, no mitigation measures are<br />

needed.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!