WEST AFRICAN POWER POOL (WAPP) PÖYRY ENERGY LTD.<br />

Mount Coffee HPP ESIA and RAP 2012-09-18<br />

ESIA Report Page 149<br />

Issue Project component Impact Mitigation measures Related Sub Monitoring and<br />

Management Plans (S-MMP)<br />

Cultural<br />

Heritage<br />

Emergency<br />

preparedness<br />

General construction related issues<br />

Air quality Quarries,<br />

construction<br />

activities and<br />

transportation<br />

activities<br />

Reservoir Destruction of any cultural sites<br />

within the reservoir area<br />

Air pollution mainly to nitrogen<br />

oxides (NOx) and Particulate<br />

Matter (PM10)<br />

� Emission related to<br />

construction activities<br />

� Emission related to<br />

transport of material.<br />

� Emission related to<br />

borrow areas.<br />

Impact restricted to construction<br />

site (including quarries and access<br />

roads) and phase.<br />

Mosques will have to be replaced Resettlement Action Plan<br />

For the activity of emptying the reservoir in case of alarm or<br />

hurricane or flooding, the proponent must inform nearby<br />

communities downstream that may be affected in case of release of<br />

high flows from the reservoir of the project.<br />

Develop an Emergency Preparedness Plan (fire, flooding, hurricanes,<br />

earthquakes)<br />

Use adequate and well maintained construction and transportation<br />

equipment and the contractor has to develop a maintenance program<br />

to ensure this.<br />

Take good measures for dust suppression:<br />

� this includes among others good housekeeping,<br />

� Instruct workforce on appropriate measures to minimize air<br />

pollutants.<br />

� optimization of storage on-site of materials that are known<br />

to be whirled up by wind<br />

� water sprinkling especially on unpaved roads during dry<br />

season, if necessary.<br />

� Truck which transport construction material for longer<br />

distances (quarry to construction site) should be covered.<br />

� Do not exceed speed limits<br />

� Do not burn waste<br />

Organize the sequences of construction activities in a way that the<br />

use of equipment powered by diesel fuel is optimized and duration is<br />

minimized (switch-off the engine during parking periods).<br />

Emergency Preparedness Plan<br />

EH&S Management and Monitoring of<br />

the contractor<br />

Equipment Maintenance Management<br />

Plan<br />

Traffic Management Plan<br />

Waste Management Plan<br />

Air Quality Management Plan.