WEST AFRICAN POWER POOL (WAPP) PÖYRY ENERGY LTD.<br />

Mount Coffee HPP ESIA and RAP 2012-09-18<br />

ESIA Report Page 240<br />

discussions at this training workshop would be an input to finalise the ESMP reports. At<br />

the conclusion of the training, the Consultant shall submit a comprehensive report on<br />

the training conducted, as part of the Monthly Report for the month in which the<br />

training was conducted.<br />

The Consultant will analyse the need for additional capacity building for the involved<br />

institutions and actors, and design such programme, and provide a cost estimate (see<br />

also 4.1.6.c).<br />

4.1.9. Public Information and Sensitisation Campaign<br />

At the end of the study and elaboration of various reports approved by the relevant<br />

authorities in the country, the Consultant shall prepare a non-technical summary report<br />

of the impact assessments in the official languages of the country and in the local<br />

languages prevailing in the areas of the project.<br />

The Consultant shall carry out informative and sensitization campaigns to the<br />

populations, and to public and private entities. The campaigns shall be undertaken in<br />

the official language of the country and in the local languages of the project area. The<br />

public informative and sensitization campaigns shall contain issues related but not be<br />

limited to:<br />

� Project Implementation,<br />

� Project benefits for the country and the populations,<br />

� Environmental and social impacts of the project,<br />

� Envisaged compensation measures<br />

� Dangers and safety measures related to the project<br />

The Consultant shall propose an appropriate approach and methodology that shall be<br />

approved by institutions in charge of environmental protection in the country. The<br />

Consultant shall prepare appropriate presentation material and propose a medium<br />

acceptable to institutions in charge of environmental protection in the country for the<br />

informative and sensitization campaign.<br />

4.1.10. Project Alternatives<br />

The Consultant will explore the potential of other alternative sources of power<br />

generation in the country and in particular for the power supply to Monrovia and<br />

comment on cost, economic aspects, construction time and environmental and social<br />

aspects, compared to the Mount Coffee Hydropower project.<br />

4.1.11. Cost estimate<br />

The Consultant shall prepare a detailed cost estimate of the actions resulting from the<br />

proposed mitigating and compensation measures and all the activities needed to<br />

implement the Management and Monitoring Plans and Programs.<br />

4.2. Additional studies and tasks<br />

The following additional studies and tasks are included in the scope of the work: