WEST AFRICAN POWER POOL (WAPP) PÖYRY ENERGY LTD.<br />

Mount Coffee HPP ESIA and RAP 2012-09-18<br />

ESIA Report Page 142<br />

Issue Project component Impact Mitigation measures Related Sub Monitoring and<br />

Management Plans (S-MMP)<br />

Construction area,<br />

quarries, burrows<br />

and dumping areas<br />

Contamination of soil The maintenance of machinery and lorries has to be done in workshops,<br />

liquids including cleaning water should be collected in tanks.<br />

Storage of fuel and lubricants has to be in tight containers placed on<br />

sealed surfaces undernice a roof. The storage has to be equiped with<br />

all safety measures to prevent oil spilling including fire fighting<br />

equipment. The area needs to be marked.<br />

In the case of an oil spill sufficient quantities of oil absorbent have to<br />

be stocked. The contaminated absorbent has to be disposed of properly.<br />

Hazardous waste has to be stored in designated closed tanks or areas.<br />

Solid waste generated during construction and at campsites will be<br />

properly treated and safely disposed of only in demarcated waste<br />

disposal sites.<br />

All activities which could contaminate the soil have to be carried on a<br />

sealed surface and if accidental spillage occurs that the contaminated<br />

soil has to be excavated and disposed properly.<br />

Awareness has to be raised within the workforce to properly dispose<br />

of the waste.<br />

Climate Reservoir Not required No S-MMP<br />

Hydrology Dam, reservoir,<br />

turbine operation;<br />

reservoir filling<br />

Small impact due to change of<br />

water discharge pattern<br />

A minimum of 8 m³/s should be released from the spillway structure<br />

as the required residual flow.<br />

The possibility of installing a small unit at the spillway for turbining<br />

this water should be investigated (for technical and economic<br />

feasibility). This would reduce the loss in energy production due to<br />

allocating this residual flow, and it might be possible to use the<br />

energy generated there for electrification of the surrounding villages.<br />

A preliminary analysis shows that this would have an overall positive<br />

effect.<br />

EH&S Management and Monitoring of the<br />

Contractor<br />

Equipment Maintenance Management<br />

Plan<br />

Wastewater Management Plan<br />

Waste Management Plan<br />

Pollutant Spill Contingency Plan