WEST AFRICAN POWER POOL (WAPP) PÖYRY ENERGY LTD.<br />

Mount Coffee HPP ESIA and RAP 2012-09-18<br />

ESIA Report Page 237<br />

4.1.2.1.12. Overview and plan of biomass and vegetation clearance in the reservoir<br />

area and construction sites<br />

4.1.2.1.13. St. Paul river estuary and maritime impact<br />

4.1.2.1.14. Feasibility to qualify for CDM credits and compliance with Requirements<br />

of the EU Linking Directive<br />

4.1.2.1.15. Tentative list of envisaged Site Specific Environmental Plans<br />

4.1.2.1.16. Watershed management to protect the reservoir from sedimentation and to<br />

maintain water quality<br />

4.1.2.2. Review of operational issues with respect to Environmental and Social<br />

Impact:<br />

4.1.2.2.1. Rules regarding the reservoir filling and a reservoir filling plan<br />

4.1.2.2.2. Operation of the reservoir<br />

4.1.2.2.3. Environmental Management of the Operator, including definition of his<br />

environmental and social responsibilities<br />

4.1.2.2.4. Need for watershed management in order to protect the reservoir from<br />

siltation<br />

4.1.2.2.5. Review of environmental flow and proposals for requirements (in m3/s in<br />

dry and wet season), including the period of reservoir filling and possible<br />

impact on project design<br />

4.1.2.3. Environmental and Social Impact on:<br />

Rehabilitation of the access road to the Mount Coffee Hydropower plant site and the<br />

substation from Monrovia<br />

4.1.3. Mitigation Measures<br />

The Consultant shall propose mitigation measures, including needs for compensation<br />

for the potential environmental and social effects that would occur from preconstruction,<br />

construction and operational activities.<br />

4.1.4. Provisional Environmental & Social Management Plan (ESMP)<br />

The Consultant shall identify personnel and environmental management and training<br />

requirements for each stage of the project development and develop a Provisional<br />

Environmental & Social Management Plan (ESMP) as part of the overall ESIA report.<br />

The ESMP shall include an appropriate monitoring programme to determine impacts on<br />

the physical, biological and human environments. This programme will be used to<br />

verify whether predictions of environmental and social impacts, developed in the design<br />

phase, are accurate and that unforeseen impacts are detected at an early stage. This will<br />

allow corrective measures to be implemented before significant damage takes place.<br />

The monitoring plan should specify what will be monitored (indicators), when, by<br />

whom and the cost implications (investment cost and recurrent costs). The ESMP shall<br />

include a Vegetation Management Plan as well as a plan for the Management of<br />

Archaeological and Cultural Property.