WEST AFRICAN POWER POOL (WAPP) PÖYRY ENERGY LTD.<br />

Mount Coffee HPP ESIA and RAP 2012-09-18<br />

ESIA Report Page 178<br />

Table 24-4: Renewable electricity projects<br />

Type Installed capacity Supply to Observations<br />

Mein River Mini<br />

Hydro<br />

Wayavah Falls<br />

Micro Hydro<br />

Sorlumba Biomass<br />

Electricity Project<br />

COCOPA Biomass<br />

Electricity Project<br />

1 MW >3000 consumers potential for 1.5 MW; electricity "at<br />

less than half the current cost"<br />

15 kW 150 HH<br />

35 kW 200 HH Fuel: crude palm oil<br />

240 kW 4700 HH, 1 hospital Fuel: rubber tree woodchips;<br />

estimated tariff 0.3-0.35 USD/kWh<br />

Source. LESSP, direct communication 2012-04-23<br />

From these few examples, it becomes quite evident that project of this type can be<br />

solutions especially for remote areas, for which it is unlikely that they will be connected<br />

to a main grid in the short or medium term. However, they cannot really be considered<br />

as an alternative to Mt. Coffee or other medium to large sized hydropower projects).<br />

24.3 Conclusions<br />

The main conclusion from this evaluation is that the rehabilitation of Mt. Coffee, as<br />

currently planned, is the preferred option from an environmental and social point of<br />

view. The benefits from this Project by far outweigh its negative impacts, and the<br />

evaluated alternatives are less advantageous.