WEST AFRICAN POWER POOL (WAPP) PÖYRY ENERGY LTD.<br />

Mount Coffee HPP ESIA and RAP 2012-09-18<br />

ESIA Report Page 145<br />

Issue Project component Impact Mitigation measures Related Sub Monitoring and<br />

Management Plans (S-MMP)<br />

Work force Overexploitation of the forest<br />

resources for charcoal, fire wood<br />

and construction wood due to influx<br />

of people to the project area<br />

Terrestrial Fauna Reservoir Up to 8.1 km 2 of habitat will be<br />

submerged.<br />

Construction area,<br />

roads and all<br />

temporary structures<br />

Work force Disturbance caused by the presence<br />

of a high number of people. Risk of<br />

illegal hunting.<br />

Fish and Fishing Dam Disruption of river continuum.<br />

Habitat fragmentation<br />

Reservoir Will change from a lotic ecosystem<br />

more to a lentic ecosystem, which<br />

results in a change of fish species<br />

composition.<br />

Reservoir filling<br />

phase<br />

Construction<br />

activities<br />

Any illegal logging of the work force must be forbidden<br />

Strengthen the awareness of the workforce for the environment<br />

(protected areas, plants and wildlife) to avoid logging, hunting etc. at<br />

project site and in the surrounding<br />

needs to be part of the employees<br />

contract and of the Human Resources<br />

Policy<br />

Reservoir clearing before impoundment needs to be carried out Re-cultivation Management Plan will<br />

improve habitats for terrestrial fauna.<br />

Damage to the natural habitat should be minimized where possible. Re-vegetation Management Plan will<br />

improve habitats for terrestrial fauna.<br />

Hunting by members of the work force must be forbidden.<br />

Strengthen the awareness of the workforce for the environment<br />

(protected areas, plants and wildlife) to avoid logging, hunting etc. at<br />

project site and in the surrounding<br />

needs to be part of the employees<br />

contract and of the Human Resources<br />

Policy<br />

Not required Fish Monitoring Management Plan<br />

It is recommended to create a Fisheries bureau connected to a market<br />

upstream of the dam, with a staff capable of insuring a sound<br />

management of the fishery resources.<br />

Preparation of a fish breed management program<br />

A minimum discharge of 8 m 3 /s has to be released.<br />

Fish Monitoring Management Plan<br />

Risk of water contamination See mitigation measures of water quality EH&S Management and Monitoring of the<br />

Contractor<br />

Protected Areas Operation No impacts Not required ----<br />

Equipment Maintenance Management<br />

Plan<br />

Wastewater Management Plan<br />

Waste Management Plan<br />

Pollutant Spill Contingency Plan