01.12.2012 Views

Temperature - European Investment Bank

Temperature - European Investment Bank

Temperature - European Investment Bank

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WEST AFRICAN POWER POOL (WAPP) PÖYRY ENERGY LTD.<br />

Mount Coffee HPP ESIA and RAP 2012-09-18<br />

ESIA Report Page 148<br />

Issue Project component Impact Mitigation measures Related Sub Monitoring and<br />

Management Plans (S-MMP)<br />

Public Health Potential negative effect on health<br />

(diseases brought from outside by<br />

workers)<br />

Risk of STD (Sexual transmitted<br />

Diseases) / HIV / AIDS<br />

Introduction of new diseases<br />

Possible increase in malaria<br />

prevalence<br />

Exposure to acute respiratory<br />

infections<br />

Exposure to wastes and other<br />

pollutants<br />

Increased risk of accidents<br />

All workers should attend a work shop on communicable diseases<br />

(TBC, HIV/AIDS and STDs (Sexual transmitted Diseases). How to<br />

get infected, how to recognise symptoms, what should be done and<br />

on prevention measures.<br />

Every worker has to have the necessary vaccination (Hepatitis A and<br />

B, Tetanus, etc.)<br />

Overall good housekeeping contributes to maintain hygienic and safe<br />

conditions on the construction site.<br />

Do not create additional breeding places at the construction site for<br />

arthropods and snails e.g. unnecessary ponds, tires etc.<br />

Vector control at the individual level (use of mosquito nets,<br />

repellents, etc.), and at the Community level by the destruction of<br />

breeding sites using biological simulicides to avoid additional<br />

environmental pollution.<br />

Regular epidemiological monitoring should be conducted through<br />

surveys to determine the transmission dynamics of vectors and their<br />

seasonality.<br />

Rehabilitation and/or equipment of one of the most closed clinics,<br />

and the provision of minimum equipment is necessary to take care of<br />

emergency. It is not necessary to install a medical center in the camp,<br />

but to improve one of the existing clinics that will benefit to the local<br />

population after the dam construction. This takes into account: the<br />

provision of basic supplies, the supply of essential drugs, the<br />

establishment of electric power, the provision of a motorcycle for<br />

outreach and an ambulance for references.<br />

A campaign on hygiene and sanitation must be maintained regularly<br />

to promote healthy behaviours. Similarly, it is important to develop<br />

devices for household waste collection, disposal and wastewater<br />

treatment and latrines maintenance<br />

Install Project Information Center and prepare a Community Relation<br />

Plan and inform the population about the Project.<br />

Speed limits and a safety driving training should be implemented<br />

Improve infrastructure in the area directly affected by the project<br />

(maintenance of access roads)<br />

Control activities affecting waters and landscape.<br />

Community Relation Management Plan<br />

Health and Safety Management Plan<br />

Traffic Management Plan

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!