WEST AFRICAN POWER POOL (WAPP) PÖYRY ENERGY LTD.<br />

Mount Coffee HPP ESIA and RAP 2012-09-18<br />

ESIA Report Page 1<br />

PART A BASELINES<br />

1 INTRODUCTION<br />

1.1 The Assignment<br />

With a letter dated November 10, 2011, WAPP General Secretariat, Cotonou, Bénin,<br />

mandated Pöyry Energy Ltd., Zurich, Switzerland with the preparation of the<br />

Environmental and Social Impact Assessment and Resettlement Action Plan<br />

for the project of rehabilitation of the<br />

64 MW Mount Coffee Hydropower Plant, Liberia.<br />

The effective date of the Contract was defined as the date of this letter, November 10,<br />

2011. The Consultant arrived in Monrovia on November 13, 2011.<br />

According to this contract, Pöyry Energy Ltd., on behalf of WAPP and LEC, will<br />

prepare a full ESIA and ESMP for the Project. The ESIA and ESMP will follow the<br />

requirements of Environment Protection and Management Law of Liberia (Section 8),<br />

dated November 26, 2002 and the Republic of Liberia Environmental Protection<br />

Agency Environmental Impact Assessment Procedural Guidelines as well as applicable<br />

International Standards. The main applicable international standards for the Mt. Coffee<br />

HPP ESIA are the Operational Policies (OPs) of the World <strong>Bank</strong> (WB; see Chapter 2.4).<br />

The Terms of Reference for this assignment are presented in Annex 1.1.<br />

Work on the assignment officially started with the kick-off meeting held in LEC’s<br />

premises on November 14, 2011.<br />

1.2 Scope of the Report<br />

This is the ESIA Report for Mt. Coffee HPP. The main aims of this Report are:<br />

� To provide a description of the Project.<br />

� To provide the baseline, i.e. a description of the prevailing environmental and<br />

socio-economic situation of the project area, on the basis of the original TOR<br />

and, where applicable, on the precision made in the Scoping Report of March<br />

2012.<br />

� To identify all relevant impacts of the Project on the environment and the human<br />

population of the project area.<br />

� To identify and describe the required mitigation measures.<br />

� To prepare a Draft Environmental and Social Management Plan; this will then<br />

by finalised in a later stage of the assignment, taking into account the<br />

observations from the involved parties.<br />

� To come to an overall conclusion on environmental and social acceptability of<br />

the Project.<br />

According to the TOR, the ESIA also has to evaluate, in the form of a CIA and to the<br />

extent possible with the available information, the cumulative impacts of the entire St.