01.12.2012 Views

Temperature - European Investment Bank

Temperature - European Investment Bank

Temperature - European Investment Bank

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WEST AFRICAN POWER POOL (WAPP) PÖYRY ENERGY LTD.<br />

Mount Coffee HPP ESIA and RAP 2012-09-18<br />

ESIA Report Page 164<br />

� Other institutions:<br />

21.5.4 Required Input<br />

o Responsible person from the EPA for the monitoring of the<br />

Environmental Issues on construction sites (environmental engineer or<br />

any other equivalent scientific education).<br />

o Responsible person from the bureau of fishery for inland fishery<br />

o Person responsible for the monitoring of health and safety issues from<br />

the governmental side (Ministry of Labour or Ministry of Health)<br />

o Person responsible for reforestation of the forestry development agency<br />

(Ministry of Agriculture)<br />

o Person from the agricultural research institute and/or university.<br />

For finalising the training program, the Consultant needs to get the following input from<br />

LEC and the other institutions involved, like e.g. EPA, other Ministries:<br />

� Choice of topics: from the ones proposed, or, if required, other subjects which<br />

they deem as important.<br />

� Designation of participants: number, qualifications, specific training needs (if<br />

identified).<br />

Once this information is available, it will then be possible to plan the workshops in<br />

detail.<br />

21.5.5 Expected Outcome<br />

The aim of this training program will consist mainly in raising the awareness of the<br />

participants (who presumably will be in charge of such issues during project<br />

implementation and operation) for problems related to EH&S, and to provide a number<br />

of instruments (sample management plans, monitoring procedures etc.) for dealing with<br />

the issues at hand.<br />

A possible outcome could also be that additional training needs will be identified. It is<br />

obvious, however, that in such a case alternative possibilities for additional training<br />

would have to be evaluated.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!