01.12.2012 Views

Temperature - European Investment Bank

Temperature - European Investment Bank

Temperature - European Investment Bank

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WEST AFRICAN POWER POOL (WAPP) PÖYRY ENERGY LTD.<br />

Mount Coffee HPP ESIA and RAP 2012-09-18<br />

ESIA Report Page 143<br />

Issue Project component Impact Mitigation measures Related Sub Monitoring and<br />

Management Plans (S-MMP)<br />

Water quality Reservoir Change from river to lake<br />

ecosystem.<br />

Water quality Construction<br />

activities<br />

Possible greenhouse gas emission<br />

Increased load in suspended solids<br />

stemming from the construction<br />

site.<br />

Contamination with concrete,<br />

resulting in a higher pH which<br />

could potentially be toxic for fish.<br />

Contamination with hydrocarbons<br />

(fuel, lubricants etc.) and other<br />

toxic substances used on site.<br />

Contamination with human waste<br />

from the worker's camp.<br />

Cutting of trees which can be used, either for timber or for producing<br />

charcoal. The local population should be encouraged to use all timber<br />

resources within the reservoir to the extent possible.<br />

Cutting and burning of all trees which cannot be used, before<br />

impoundment to reduce obstacles and dangers for boats and fishing<br />

gear.<br />

Shortly before impounding cutting of as much vegetation as possible,<br />

and burning it.<br />

In general all equipment, machinery, trucks and camp installations<br />

have to be located in a distance of more than 250 m to water used for<br />

human consumption and at least 150 m to any body of surface water.<br />

Strict measures must be taken to prevent oil pollution of the river.<br />

The most important are:<br />

� Storage of fuel and lubricants away from the river, in tight<br />

containers placed on sealed surfaces.<br />

� Storage areas shall be designed such that they will contain 110<br />

% of the largest container/ vessel stored in the storage area and<br />

waterproof; have available on site equipment and materials to<br />

execute clean-up (sufficient absorband).<br />

� Good maintenance of vehicles and machines to prevent oil losses.<br />

� No cleaning or maintenance of vehicles or machines in close<br />

proximity to the river. This must be done on specially prepared<br />

places (workshops) equipped with oil skimmers.<br />

Unnecessary dangerous chemicals and/or toxic substances are<br />

forbidden to use.<br />

Do not install a deposit even for uncontaminated gravel from the<br />

quarry near any body of surface water<br />

All the water draining down from the quarry needs to be lead to<br />

sedimentation and neutralisation tanks and has to be treated before<br />

releasing it to the river.<br />

All the waters from the batching plants, the concrete mixer washing<br />

facilities and the crusher plants needs to be collected and treated<br />

before releasing to the environment.<br />

Waste water from the camp site must be collected in portable latrines<br />

or septic tanks and has to be treated before releasing into a river.<br />

Water Quality Management Plan during<br />

operation<br />

Waste Water Management Plan during<br />

operation<br />

Waste Management Plan during<br />

Operation<br />

EH&S Management and Monitoring of<br />

the Contractor<br />

Equipment Maintenance Management<br />

Plan<br />

Wastewater Management Plan<br />

Waste Management Plan<br />

Pollutant Spill Contingency Plan

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!