WEST AFRICAN POWER POOL (WAPP) PÖYRY ENERGY LTD.<br />

Mount Coffee HPP ESIA and RAP 2012-09-18<br />

ESIA Report Page 150<br />

Issue Project component Impact Mitigation measures Related Sub Monitoring and<br />

Management Plans (S-MMP)<br />

Noise Quarries,<br />

construction<br />

activities and<br />

transportation<br />

activities<br />

Vibration Construction<br />

activities and<br />

quarries<br />

Mainly on the Workforce<br />

Use adequate and well maintained construction and transportation<br />

equipment including state-of-the-art built in systems (muffler) to<br />

reduce the noise. The contractor has to develop a maintenance<br />

program to ensure this.<br />

Instruct the workforce to avoid unnecessary noise.<br />

Use adequate and state of the art techniques for blasting, which do<br />

not exceed the exposition time to the noise.<br />

Workers exposed to excessive noise have to wear ear protectors and<br />

the exposition time has to be limited.<br />

The quarry must be located in a sufficient distance to any populated<br />

area.<br />

Separate installation areas, for example mechanical workshops etc.<br />

from that are used by people for temporary housing and recreation<br />

distance should be at least 10 m.<br />

Noise and vibration associated with the use of explosives needs to be<br />

monitored. Max 136db<br />

Avoid any noise intensive works such as metalworking, blasting (in<br />

quarries) etc. during night time.<br />

Avoid transporting of material (rock, concrete, etc.) during night, if<br />

they have to pass villages.<br />

Use best practice to reduce the dispersion of material and vibrations<br />

near any physical structures.<br />

Install a monitoring system at sensitive sites and monitor and record<br />

vibrations during blasting events.<br />

Use state of the art techniques<br />

Restrict access during blasting events.<br />

EH&S Management and Monitoring of<br />

the contractor<br />

Traffic Management Plan<br />

Equipment Maintenance Management<br />

Plan<br />

Explosives Management Plan<br />

Health and Safety Management Plan<br />

EH&S Management and Monitoring of<br />

the contractor<br />

Explosives Management Plan<br />

Health and Safety Management Plan