WEST AFRICAN POWER POOL (WAPP) PÖYRY ENERGY LTD.<br />

Mount Coffee HPP ESIA and RAP 2012-09-18<br />

ESIA Report Page 152<br />

Issue Project component Impact Mitigation measures Related Sub Monitoring and<br />

Management Plans (S-MMP)<br />

Use, transport<br />

and storage of<br />

explosives<br />

Take into account the procedures established by the responsible<br />

authorities of Liberia and/or any international standards accepted by<br />

Liberia<br />

Do not use explosives in areas not authorized for this purpose.<br />

Explosive material should be stored in a state of the art storage (solid<br />

structure, fire resisted material, ventilation for heat control,<br />

electrically grounded, clean and dry, exclusively for Explosives) it<br />

has to be labelled with the necessary warnings, and needs to be<br />

closed and lockable.<br />

The storage needs to have an area open surrounding of 10 m and no<br />

other combustible material is allowed to be stored in a distance less<br />

than 20 meter.<br />

Detonators should be stored in a different storage or at least in a<br />

different compartment of the storage.<br />

Blasting agents should be stored separate from explosives, safety<br />

fuses and detonating cords.<br />

Just persons authorised should be allowed to store, handle, use and<br />

transport explosive material. The authorisation has to be maintained<br />

if required by the Liberian legislation and the certificate should be<br />

kept on site.<br />

For transport of explosives use designated closed containers with<br />

insulation. Use separate containers for the detonators<br />

Do not allow people, workers and animals in a distance of less than<br />

500 m<br />

Implement suitable warning system (banners, mobiles, sirens etc.)<br />

Activate an auditable alarm 15 minutes before blasting<br />

Explosives Management Plan