WEST AFRICAN POWER POOL (WAPP) PÖYRY ENERGY LTD.<br />

Mount Coffee HPP ESIA and RAP 2012-09-18<br />

ESIA Report Page 198<br />

25.4.2 Costs<br />

The economic analysis is generally carried out for constant or real prices (no<br />

consideration of inflation). In the present case, US Dollars at 2012 level were used. All<br />

the costs and benefits were compared over a period of operation of 50 years, which<br />

corresponds to the average economic life of a hydropower plant. For the Base Case a<br />

discount rate of 10% was used.<br />

25.4.2.1 <strong>Investment</strong> Cost<br />

According to the latest report prepared by the firm Stanley Consultants, the total<br />

construction cost for the rehabilitation of the Mount Coffee Hydropower Plant is equal,<br />

in round figures, to 178 million US $. This amount includes all the costs incurred for the<br />

implementation of the rehabilitation of Mount Coffee Hydropower Plant.<br />

In the economic analysis, as was mentioned in Section 4.1, all transfer payments,<br />

subsidies, taxes have to be excluded. Stanley Consultants estimated that taxes and duties<br />

represented a sum of 13.50 million US $. That means that the investment cost to be<br />

considered for the economic analysis is equal to 164.1 million US $.<br />

The distribution of the investment cost over the construction period is as follows, in<br />

million US $:<br />

Table 25-15: MCHPP Rehabilitation Project, distribution of cost<br />

Year -4 -3 -2 -1 1<br />

Percentage 14.60 17.00 37.90 30.10 0.40<br />

Amount 23.959 27.897 62.194 49.394 0.656<br />

25.4.2.2 Annual Operation and Maintenance Cost<br />

The annual operation and maintenance cost covers the following outlays:<br />

� Operation and maintenance<br />

� Renewals, respectively replacement<br />

� Insurance<br />

� General and administrative.<br />

Usually for hydropower projects, the annual operation and maintenance cost is related<br />

to the corresponding investment cost. In the present analysis, it was assumed that the<br />

annual operation and maintenance cost is equal to 1% of the investment cost. This<br />

percentage takes into account the type and size of the Mount Coffee Hydropower Plant.<br />

Hence in the present study, the annual operation and maintenance cost was taken equal<br />

to 1.641 million US $.