WEST AFRICAN POWER POOL (WAPP) PÖYRY ENERGY LTD.<br />

Mount Coffee HPP ESIA and RAP 2012-09-18<br />

ESIA Report Page 176<br />

m³/s<br />

Figure 24-1: River flow and plant operating conditins, 80 MW<br />

m³/s<br />

4'000<br />

3'500<br />

3'000<br />

2'500<br />

2'000<br />

1'500<br />

1'000<br />

500<br />

160<br />

140<br />

120<br />

100<br />

80<br />

60<br />

40<br />

20<br />

80 MW, year<br />

0<br />

0.00 20.00 40.00 60.00 80.00 100.00<br />

% exceedance<br />

80 MW, low flow situation<br />

0<br />

70.00 75.00 80.00 85.00 90.00 95.00 100.00<br />

% exceedance<br />

Figure 24-2: Plant operating conditions, 80 MW, low flow situation<br />

river flow<br />

4 units 100%<br />

load following<br />

river flow<br />

available flow<br />

residual flow<br />

1 unit 100%<br />

1 unit 40%<br />

The main consequences of this alternative, therefore, can be summarised as follows:<br />

� There would be a considerable increase in electricity generation. The technical<br />

assessment of the project will have to determine if this increase justifies the<br />

increase in investment costs.<br />

� The power plant would pass more water through the turbines, thus reducing the<br />

"loss" of spilling.