WEST AFRICAN POWER POOL (WAPP) PÖYRY ENERGY LTD.<br />

Mount Coffee HPP ESIA and RAP 2012-09-18<br />

ESIA Report Page 62<br />

9.1.2 Conclusion<br />

9.2 Impact<br />

Nesogordonia papaverifera is a timber species which grows in dense stands commonly<br />

in areas where savannah has been replaced by forest. It has good regeneration in<br />

disturbed forest.<br />

� No habitat will disappear in the dam’s zone of influence. Each vegetation chance<br />

in the reservoir and downstream is found in upstream.<br />

� All the 33 short height species found in the reservoir have been recorded<br />

elsewhere.<br />

As concerns plants, no species will disappear due to the future water reservoir. In fact<br />

these plants are also found outside the project impact area, and everywhere in the<br />

region. However, there is not cause to worry about availability of any one of them in the<br />

region, even though some plants are becoming scarce near inhabited areas.<br />

Impact related to project limits<br />

The submersion and clearing of forest-covered surfaces to construction works present<br />

several impacts.<br />

� Vegetation change: Loss of land habitat and extension of adapted aquatic or<br />

river bank habitat, e.g. near the power house, the level of water will increase and<br />

trees like Pterocarpus santalinoides will be killed by submersion in and along<br />

the river borders.<br />

� Submersion of areas used by populations will result in the reduction of family<br />

land.<br />

� Loss of plants and very few traded timbers in the reservoir.<br />

� Loss of agroforest of Hevea brasiliensis in the reservoir.<br />

� Possibility of greenhouse gas emission.<br />

Impact related to rehabilitation works<br />

� The main risk during the rehabilitation of the dam and the power house is the<br />

overexploitation of the forest resources.<br />

o Influx of people to the project area will increase the charcoal production.<br />

o Illegal timber exploitation and charcoal production by the workforce, for<br />

firewood and construction wood.<br />

o Increase in production of charcoal by local people to sell it to the<br />

workforce.<br />

Impact related to hydroelectric power plant greenhouse gas emission<br />

� In addition to the reservoir, the project will clear considerable surface area<br />

situated outside the reservoir for keeping the building materials and for the<br />

following infrastructures:<br />

o Rehabilitation of the hydroelectric plant and power house,