WEST AFRICAN POWER POOL (WAPP) PÖYRY ENERGY LTD.<br />

Mount Coffee HPP ESIA and RAP 2012-09-18<br />

ESIA Report Page 188<br />

25.3.3 Future Power Market and Supply<br />

25.3.3.1 Preliminary remarks<br />

Essentially the following documents were reviewed:<br />

� Mount Coffee Hydropower Plant, Technical and Financial Feasibility Study,<br />

Stanley Consultants, December 2008<br />

� LEC Electric Master Plan, March 2011<br />

� Options for the Development of Liberia Energy Sector, World <strong>Bank</strong>, October<br />

2011<br />

The reports so far published by Stanley Consultants in the year 2012 do not address<br />

explicitly issues related to the future power market of Liberia and are hence not<br />

mentioned in the present section.<br />

The following points are of interest in the present study:<br />

� The magnitude of the expected future demand for electricity<br />

� The options considered to cover the additional demand<br />

� The identified preferred options.<br />

The review of the three reports will be focused on these issues.<br />

25.3.3.2 Stanley Consultants Report December 2008<br />

In the Stanley Consultants Report, the maximum demand and the energy requirements<br />

for the Monrovia area were assumed to develop as follows:<br />

Table 25-5: Greater Monrovia area, maximum demand and energy requirements<br />

Unit 2015 2020 2025 2030 2035 2040<br />

Peak MW 69.0 85.0 102.0 124.0 153.0 191.0<br />

Energy GWh 273.8 321.9 373.1 440.8 525.4 635.4<br />

In their economic and financial analyses Stanley Consultants estimated that the energy<br />

produced by Mount Coffee HPP could be used as follows, all numbers in GWh:<br />

Table 25-6: Use of the energy produced by MCHPP<br />

2015 2020 2025 2030 2035 2040<br />

Mt Coffee, prod 435.0 435.0 435.0 435.0 435.0 435.0<br />

Sales to Monrovia 273.8 321.9 373.1 435.0 435.0 435.0<br />

Sales to Others 161.2 113.1 61.9 0 0 0<br />

According to the figures shown in the preceding table, the complete amount of energy<br />

produced by Mount Coffee Hydropower Plant can be immediately used. In the first