WEST AFRICAN POWER POOL (WAPP) PÖYRY ENERGY LTD.<br />

Mount Coffee HPP ESIA and RAP 2012-09-18<br />

ESIA Report Page 96<br />

In all the likely affected settlements, no social infrastructure like schools, clinics, will be<br />

affected as these are all on higher ground away from the reservoir area. Therefore there<br />

will be no need to replace them. An upgrading of the clinics would be called for, however.<br />

13.3.7 Information on Population<br />

13.4 Impacts<br />

Households involved in using, in any way, land that will be lost or otherwise affected by<br />

the project are at present being identified. The people who have their produce on this<br />

land are the project affected persons (PAP), and this is the most important category of<br />

PAP. The type of land use has been identified and is presented in the following Chapter<br />

14. Table 13-1 above shows the most likely settlements that will be affected, indicating<br />

numbers. However, for land use most of the settlements along the St. Paul River<br />

upstream of Mt. Coffee dam site have their farmlands in the reservoir. An indication of<br />

the size of these lands and the crops and trees cultivated is also shown in Chapter 14.<br />

The main part of the RAP will deal with the compensation of the losses incurred. The<br />

situation (socio-economic status) of the affected HH will be analysed, and a<br />

comprehensive socio-economic survey in settlements that will likely be affected is<br />

being carried out at present. So far six settlements, which are indicated in Table 13-1<br />

will have to be relocated. General information on the population is described in the<br />

village profiles as regards their socio-economic status derived from occupations as<br />

farmers, fishermen, gold-diggers, and hunters.<br />

13.4.1 Impacts of Construction:<br />

From a socio-economic perspective during construction there will be both positive and<br />

negative impacts. The negative impacts could include:<br />

� PAPs that have used the reservoir land to grow cash crops will lose these crops<br />

and will have to be compensated, albeit the land belongs to LEC.<br />

� Land will be expropriated and as such a resettlement will take place in areas<br />

where PAPs have constructed houses in the reservoir.<br />

� PAPs will no longer fish near the construction site but fishing may continue<br />

further upstream away from the dam site.<br />

� Access to forest will be curtailed as a lot of vegetation clearance will be done<br />

and loss of some forest resources earlier got will also disappear, e.g. collecting<br />

sticks for roof construction, herbs, mushrooms, snails, etc.<br />

� Hunting will be restricted in the vicinity of the dam due partly to thin<br />

vegetation, but most important to keep the dam site secure.<br />

� Making of charcoal in the nearby forest will be curtailed.<br />

� Increased noise due to construction and should building materials be excavated<br />

from quarries nearby. There seems to be potential to start up a quarry near<br />

present day Gbally settlement.<br />

� Possibility of increase of disease outbreaks if medical precautions are not taken<br />

to screen people coming in for employment from other areas.