WEST AFRICAN POWER POOL (WAPP) PÖYRY ENERGY LTD.<br />

Mount Coffee HPP ESIA and RAP 2012-09-18<br />

ESIA Report Page 153<br />

Issue Project component Impact Mitigation measures Related Sub Monitoring and<br />

Management Plans (S-MMP)<br />

Occupational<br />

Health and<br />

Safety<br />

General Develop occupational health and safety procedures like to wear<br />

protective equipment, proper handling of hazardous substances,<br />

working near water, etc.<br />

All workers have to use the relevant protective equipment (helmet,<br />

gloves, goggles, work boots, masks, ear plugs, etc.)<br />

All restricted plant facilities have to be labelled with caution signs,<br />

especially those with potential risk for workers<br />

All construction areas shall be marked and fenced to avoid accident<br />

from unauthorised people.<br />

Fence off all areas like excavation pits, quarries etc. to prevent<br />

accidents<br />

First aid kits need to be available at the construction site for fast<br />

action if an accident occurs.<br />

Accessible consultation sheets for review in case of contingency or<br />

emergency situations. These should have phone numbers for police,<br />

fire-fighters, Red Cross, personal supervisor or project leader.<br />

Prepare a scheme of the evacuation routes and where the fire<br />

extinguishers are located within the plant and place them at on<br />

conspicuous places.<br />

maintenance of machinery (preventive and corrective; during<br />

construction and operation)<br />

Provide sufficient portable water.<br />

Assign during construction a special area for the food intake.<br />

Separate installation areas, for example mechanical workshops etc.<br />

from that are used by people for temporary housing and recreation<br />

distance should be at least 10 m.<br />

Install portable toilets for the disposal of manure generated by the<br />

builders in a distance of at least 15 m to the river. They should be<br />

regular maintained and disinfected. The number of latrines is<br />

correlated with the number of employees and there should be one<br />

toilet for every ten (10) workers.<br />

Workshops and camp site must have acceptable conditions of light,<br />

ventilation and safety for workers.<br />

Label T&D Line poles indicating danger, high voltage<br />

Health and Safety Management Plan<br />

Emergency Preparedness Plan