WEST AFRICAN POWER POOL (WAPP) PÖYRY ENERGY LTD.<br />

Mount Coffee HPP ESIA and RAP 2012-09-18<br />

ESIA Report Page 147<br />

Issue Project component Impact Mitigation measures Related Sub Monitoring and<br />

Management Plans (S-MMP)<br />

Land use Reservoir Loss of agricultural land<br />

Loss of crops in the reservoir area<br />

Possibility of less land for cash<br />

crops as these have till now been<br />

grown in the reservoir. Unless<br />

alternative land is identified that<br />

will take on cash crop cultivation,<br />

as communal land will not support<br />

long-term perennial crops/trees.<br />

Loss of forest<br />

Put in place appropriate policies to compensate communities that<br />

may be affected by the rehabilitation of MC HPP.<br />

Identify alternative farm land for affected farmers that are accessible<br />

and of comparable productivity.<br />

Provide farming inputs (fertilizer, seeds, tools) and agricultural<br />

extension services to affected farmers to restart farming activities<br />

Minimize removal or disturbance of vegetation along ROW, around<br />

construction camps, etc.<br />

Provide a relocation or resettlement package for affected community<br />

Encourage alternative livelihood alternatives such as animal<br />

husbandry, cane tree production, rubber farming, provision of<br />

vegetable seeds, tree crop farming, lowland farming outside of the<br />

project area, etc. so as to reduce pressure on the current fallow<br />

vegetation for environmental stability.<br />

Identify alternative areas where forest product collection can be<br />

restored<br />

Minimize removal of all disturbance of vegetation around<br />

construction area<br />

Replant native vegetation in disturbed area immediately following<br />

construction<br />

Establish woodlots with fast growing native tree species outside of<br />

the project area so as to reduce pressure on the existing natural<br />

vegetation where most of the NTFPs are gathered.<br />

Re-vegetation Management Plan<br />

Resettlement Action Plan<br />

Infrastructure Reservoir Loss of mosques Any lost infrastructure will have to relocated or compensated Resettlement Action Plan