WEST AFRICAN POWER POOL (WAPP) PÖYRY ENERGY LTD.<br />

Mount Coffee HPP ESIA and RAP 2012-09-18<br />

ESIA Report Page 205<br />

PPP structures allow for greater private sector participation in the delivery of public<br />

infrastructure projects. There are numerous models for PPP. The model finally selected<br />

for a particular project must be tailored to the conditions prevailing in the concerned<br />

country. To be successful a certain number of conditions have to be met by the selected<br />

PPP model. Some of these conditions are favourable investment climate, new policy<br />

frameworks and regulation, favourable equity arrangements, secured revenues, positive<br />

technical performance.<br />

Hence the structuring of a PPP is not an easy task. However, if realized in an<br />

appropriate way, it can be beneficial for all the parties involved. It is recommended to<br />

consider this option for the implementation of Mount Coffee Hydropower Plant<br />

Rehabilitation.