WEST AFRICAN POWER POOL (WAPP) PÖYRY ENERGY LTD.<br />

Mount Coffee HPP ESIA and RAP 2012-09-18<br />

ESIA Report Page 161<br />

21.5 Training<br />

The Content of each Sub ESMP should include the following.<br />

� The Purpose<br />

� Reference and Relevant Documents (Legislation of Liberia and other applicable<br />

International Standards and other documents used)<br />

� Roles and Responsibilities<br />

� The management process<br />

o Emission standards and requirements<br />

o The project emission sources<br />

o Prevention and Control<br />

� Surveillance<br />

o Inspections<br />

o Monitoring (Measurements)<br />

o Reporting<br />

� Actions to be taken in the case of Non- compliance<br />

� Awareness and Training<br />

� Documentation and Communication<br />

The Final ESMP will contain the main issues which each Sub EMMP has to cover.<br />

According to the TOR, the Consultant, in addition to the preparation of the ESIA and<br />

the ESMP, also has to carry out a training program for selected staff of LEC and other<br />

entities involved in environmental and social management of the Project.<br />

21.5.1 Choice of Topics<br />

The following broad topics are proposed for this training:<br />

� EH&S management of large construction sites.<br />

� RAP implementation.<br />

� EH&S management of HPPs during operation.<br />

These three topics are outlined shortly.<br />

21.5.1.1 EH&S Management of Large Construction Sites<br />

Dam and power plant construction require large construction sites, usually in operation<br />

for several years, depending on the size of the project. These construction sites create a<br />

number of problems related to health, environment and safety, which have to be<br />

managed properly. This requires the necessary means (infrastructure, material, budget),<br />

but first of all personnel properly trained in and aware of these issues, who can manage<br />

them.