12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

B. All work shall be done in strict accordance with the manufacturer’s recommendations.3.07 QUALITY CONTROLA. The Contractor shall be solely responsible for the quality control of all concrete.B. Concrete which does not meet the requirements of these specifications may be rejected by theEngineer.END OF S<strong>EC</strong>TION03306 - 511/07 CONCRETE FOR UTILITIES

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!