12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

S<strong>EC</strong>TION 15360PROPANE GAS DISTRIBUTION SYSTEMPART 1 <strong>GENERAL</strong>1 .1 DESCRIPTIONA. The work of this section consists of furnishing and installing low-pressure underground propanegas distribution piping, transition risers, valves, valve boxes, aboveground gas piping, regulators,meters, and all other accessories and specialties necessary for a complete and operable propanegas distribution system.1 .2 DEFINITIONA. Bedding and backfill material types (BD, SB, BF) are defined in Section 02320.1 .3 RELATED WORKA. General mechanical provisions - Section 15010B. Basic materials and methods - Section 15050.C. Propane storage system and appurtenances - Section 15480.1 .4 QUALITY ASSURANCEA. All work performed under this section shall meet all recommendations and requirements of 1994IAPMO Uniform Plumbing Code (UPC), NFPA 54-96, NFPA 58-95, ASTM D2774-94, Code ofFederal Regulations (CFR) Title 49, California Title 8, Division 1, Chapter 4, and all otherapplicable national, state, local, and propane gas supplier standards and regulations.B. Propane distribution system installer shall have had successful installation experience on projectswith propane or natural gas systems work similar to that required for this project.C. Installer's personnel responsible for making heat fusion bonded joints in plastic piping shall becertified in accordance with Code of Federal Regulations (CFR) Title 49, Part 192, Section192.285. In addition, installer's personnel responsible for the operation of electrofusionequipment shall be properly trained in the use of such equipment by the electrofusion equipmentmanufacturer or by one of the manufacturer's authorized representatives.1 .5 COORDINATIONA. Interruption of Services: Coordinate shutdown of water, waste, or electrical systems withContracting Officer.B. Schedule of Work: Coordinate work with other trades. In scheduling, anticipate such items asinstalling equipment through available openings in structures, coordinating common trenchingwith other utilities, delivering piping and equipment over available access roads or pathways onjob site, and determining locations of piping assembly (fusion process) work areas.C. Make minor changes in piping alignments as necessary to suit actual conditions.1 .6 PROT<strong>EC</strong>TION15360-1PROPANE GAS DISTRIBUTION SYSTEM

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!