S<strong>EC</strong>TION 02072DEMOLITIONPART 1 - <strong>GENERAL</strong>1.01 S<strong>EC</strong>TION INCLUDESA. All demolition, removal, salvage and disposal of existing structures, piping, and materials. Allbackfill and compaction necessary to restore surface conditions to ambient contouring anddensity.1.02 SUBMITTALSA. Certifications and Testing consistent with Section 01330 and including1. Permit for transport and disposal of debris2. Proposed method of demolition, proposed schedule, sequence of work, and proposedmethod and schedule for removing, maintaining, and reestablishing facilities andutilities.3. Documentation of Asbestos training prior to any demolition work.1.03 SITE CONDITIONSA. Protection1. Erect barriers, fences, guardrails, enclosures, chutes, and shoring to protect personnel,structures, and utilities remaining intact2. Protect designated trees and plants from damageB. Maintaining Traffic1. Assure minimum interference with roads, streets, driveways, sidewalks, and adjacentfacilities.C. Utility Lines and Services1. Field locate all existing utilities, buried piping, and all other surface and sub-surfacefeatures prior to demolition of the existing pump house and storage shed.2. Keep existing structures to remain and adjacent structures intact and in operation.3. Obtain permission to disrupt any utilities or services temporarily or permanently.D. Prior to demolishing a utility or facility, notify the Contracting Officer three days in advance,and plan the demolition such that the demolition will not create an unsafe condition or interferewith ongoing operations.E. Where demolition must occur in such a sequence that a portion of this facility must remainoperational, coordinate this aspect with the Contracting Officer.F. Do not burn waste material on-site.G. Provide adequate fire protection. Keep area clear of hazardous substances and debris.H. Maintain access to exits at all time.02072-105/08 DEMOLITION

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!