12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3 .7 TRANSIENT VOLTAGE PROT<strong>EC</strong>TIONA. Install across 208-volt input to control panel on load side of power on-off switch.3 .8 TRANSFORMERSA. Install transformers as shown and in accordance with manufacturer's recommendations.3 .9 NAMEPLATES, LEGEND PLATES AND WIRE MARKERSA. Nameplates: Identify all panels, motors, motor starters, control points, control centers, disconnectswitches. Fasten nameplates with finish screws or rivets.1. Remotely Mounted Controls: Identify the equipment controlled.2. Panels: Identify panel number, feeder number, and voltage of panel bus.3. Safety Switches, Relays, and Motor Starters: Identify equipment controlled and circuitsfrom which they are fed.4. Motors: Identify motors as shown on drawings.B. Legend Plates: Install for all push-buttons, pilot lights, selector switches, and selectorpush-buttons.C. Wire Markers: Install at each end of each wire interconnecting between such items as controlpanels, sensors, and control devices, and each end of control wires within control panels, motorcontrol centers, and other such controllers. Wiring markers shall correspond to control wirenumbers on schematic diagrams.END OF S<strong>EC</strong>TION16050-605/08 BASIC MATERIALS AND METHODS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!