a. 1/2-inch to 6-inch: Socket fusion type with integral heating coils. Joining of pipeand fittings by electrofusion shall be accomplished with the fitting manufacturer'sheating coil control box. Uponor Aldyl EF2000, or approved equal.2 .2 ABOVEGROUND GAS PIPE AND FITTINGSA. Piping: ASTM A53-96. Type E or S, Schedule 40 black steel pipe.B. Fittings: ANSI B16.3-85. Class 150, threaded malleable iron. Cast iron fittings shall not be used.C. Unions: ANSI B16.39-86. Class 150, threaded malleable iron, ground seat, bronze-to-iron.D. Flexible Piping Connectors: Convoluted stainless steel inner pipe with braided stainless steelcover, end connections to match connected pipe or pipe fittings, 350 psig working pressure, 18-inch minimum length, suitable for LP-gas service.E. Pipe Hangers and Supports: Section 15050.2 .3 GAS SERVICE AND TRANSITION RISERSA. Anodeless type with polyethylene gas carrier pipe and fusion-bonded epoxy coated steel jacketpipe. Aboveground end of transition riser shall be threaded. Vertical and horizontal legdimensions shall be as necessary to meet depth-of-cover requirements. Size to match connectingpiping. ASR, by Uponor Aldyl Co., Shawnee, Oklahoma 74801, or approved equal.2 .4 ABOVEGROUND VALVESA. Gas Cocks (Building Service Shutoff and Purge Valves): Tamperproof lubricated plug valves,with cast iron bodies, bronze keys, O-ring seals, threaded ends, and lockwings. Valves shall becapable of being relubricated under pressure and shall suitable for pressures up to 175 psig.Luboseal Meter Valve, Catalog Number H-11175, by Mueller Company, Division of TycoInternational, Ltd., Decatur, Illinois 62525, or approved equal.B. Ball Valves: UL listed, 150-psi SWP saturated, 250-psi L.P. gas, 600-psi non-shock WOG, twopiecebronze body, conventional port, bronze trim, chrome plated ball, reinforced TFE seats andstem seal, adjustable gland packing, blowout-proof stem, threaded ends. FS WW-V-35C, Type II,Composition BZ, Style 3. "LP-Gas Apollo" 80-100 Series, by Conbraco Industries, Inc.,Matthews, North Carolina 28105, or approved equal.C. Earthquake Valves: UL listed earthquake actuated shutoff valves conforming to CaliforniaStandard 12-23-1 and ANSI Z21.70-81, with aluminum body, stainless steel actuation ball, bubblelevel, manual reset lever, threaded ends, suitable for mounting in vertical pipe risers and operationat -40 o F to 150 o F ambient temperature. The valves shall actuate to shut off gas flow within 5seconds when subjected to a horizontal, sinusoidal oscillation having a peak acceleration of 0.3G(2.94 m/s 2 ) and a period of 0.4 seconds. To prevent false trips the valves shall not actuate whensubjected for 5 seconds to horizontal, sinusoidal oscillations having a peak acceleration of 0.4G(3.94 m/s 2 ) with a period of 0.1 second; a peak acceleration 0.2G (1.97 m/s 2 ) with a period of 0.4second; or a peak acceleration of 0.2G (1.97 m/s 2 ) with a period of 1.0 second. Model STQ, byEarthquake Valve Company, Van Nuys, California 91406, or approved equal.1. 3/4-inch to 1-1/4-inch: Flow capacity shall be 1,100,000 BTU per hour at 14 inches watercolumn inlet pressure for 0.60 specific gravity gas (700,000 BTU per hour for propane),with a maximum allowable working pressure of 25 psig.15360-3PROPANE GAS DISTRIBUTION SYSTEM
2. 1-1/2-inch to 2-inch: Flow capacity shall be 7,500,000 BTU per hour at 14 inches watercolumn inlet pressure for 0.60 specific gravity gas (4,760,000 BTU per hour for propane),with a maximum allowable working pressure of 60 psig.2 .5 UNDERGROUND VALVESA. Valves: Valves shall be tested in accordance with ASME B16.40-85. Valve body material shallbe PE 2406 to match piping, and stub end SDR (standard dimension ratio) shall be the same asconnecting piping. Polyvalve Ball Valves, by Nordstrom Valves, Inc. (division of BTR, Inc.),Sulphur Springs, Texas, or approved equal.1. 3/4-inch to 1-1/4-inch: Two-piece molded fusion-bonded polyethylene body, with acetalball, Buna-N seats and stem seals, stainless steel blowout-proof stem, groundwater sealunder 2-inch square stem adapter, and pipe stub ends suitable for butt or socket fusionjoints.2. 2-inch to 6-inch: Three-piece molded fusion-bonded polyethylene body, withpolypropylene ball, Buna-N seats and stem seals, plastic blowout-proof stem, groundwaterseal under 2-inch square stem adapter, and pipe stub ends suitable for butt or socket fusionjoints.B. Valve Boxes: Adjustable plastic roadway valve box, with screw-type bury depth adjustment, 5-1/4-inch nominal diameter. 5-1/4-inch Roadway Valve Box, by Ametek, Inc., Plymouth ProductsDivision, Sheboygan, Wisconsin 53082, or approved equal.1. Bottom Section: Bottom section shall be constructed of a rigid combination of polyolefin,fibrous inorganic reinforcement, and stabilizer additives to provide resistance to materialdegradation from ultraviolet light. Bottom section shall have a bell with inside dimensionsof 9-inch diameter x 7-1/2-inch high, suitable for 2-inch through 10-inch valves.2. Top Section: Top section shall be constructed of a ferrous metal impregnatedthermoplastic material suitable for detection with a magnetic metal detector.3. Roadway Ring and Cover: Traffic-rated cast iron top ring with full flange and cast irontraffic cover. Cover shall have the letters "GAS" cast into the cover surface.2 .6 PROPANE GAS REGULATORSA. Propane gas regulators shall comply with UL 144-94.B. Building Service (Secondary) Regulators: Adjustable diaphragm type, with 3/4-inch NPT springcase vent, integral high-capacity relief valve, straight pattern body, 360-degree union ring betweenbody and casing, threaded inlet and outlet on body, and 7 to 15 inches water column outletpressure adjustment range. Propane vapor capacity shall be 2,000,000 BTU per hour and outletpressure shall be factory set at 11 inches water column. Type S102C, by Fisher Controls International,Inc., McKinney, Texas, or approved equal.2 .7 METERSA. Positive displacement diaphragm type, with die-cast aluminum alloy case, molded bellows typediaphragm, reinforced flag rod, upper and lower flag rod bearings, insulated union topconnections, and digital index. Provide with appropriate meter unions on inlet and outlet.American Meter Company, Horsham, Pennsylvania 19044, or approved equal.15360-4PROPANE GAS DISTRIBUTION SYSTEM
- Page 1 and 2:
RED FIR MAINTENANCE FACILITYHVAC CO
- Page 3 and 4:
DIVISION 3 - CONCRETE03300 Cast-In-
- Page 5 and 6:
1. Install new 9,200 gallon propane
- Page 7 and 8:
A. Prior to Mobilization1. Safety P
- Page 9 and 10:
SECTION 01120NATURAL FEATURES PROTE
- Page 11 and 12:
D. Fastening ropes, cables, or guys
- Page 13 and 14:
SECTION 01270DEFINITION OF BID ITEM
- Page 15 and 16:
SECTION 01310PROJECT MEETINGSPART 1
- Page 17 and 18:
SECTION 01330SUBMITTALSPART 1 GENER
- Page 19 and 20:
2. All sets of shop drawings, manuf
- Page 21 and 22:
TRANSMITTAL CONTINUATION - NATIONAL
- Page 23 and 24:
used in archeologically sensitive a
- Page 25 and 26:
1 .3 QUALITY ASSURANCEA. Clauses en
- Page 27 and 28:
SECTION 01420REFERENCE STANDARDSPAR
- Page 29 and 30:
NEMA National Electrical Manufactur
- Page 31 and 32:
B. Quality Control Staff: The Contr
- Page 33 and 34:
CONTRACTOR'S Q.C. DAILY REPORTREPOR
- Page 35 and 36:
TEST REPORT INFORMATION SHEETCONTRA
- Page 37 and 38:
C. When temporary connections are r
- Page 39 and 40:
SECTION 01520FIELD OFFICES AND SHED
- Page 41 and 42:
F. When pedestrian traffic is detou
- Page 43 and 44:
3 .3 AIR AND WATER POLLUTION CONTRO
- Page 45 and 46:
SECTION 01720FIELD ENGINEERINGPART
- Page 47 and 48:
C. On completion of the total proje
- Page 49 and 50:
A. Provide four complete sets of da
- Page 51 and 52:
EQUIPMENT DATA SHEETEquipment Item:
- Page 53 and 54:
I. Separate demolition area from bu
- Page 55 and 56:
A. Remove demolition debris daily o
- Page 57 and 58:
(d)Repairs or replacements are to b
- Page 59 and 60:
3 .2 DEMOLITIONA. Asphalt Concrete
- Page 61 and 62:
3 .3 DEMOLITIONA. Work systematical
- Page 63 and 64:
3 .3 EXCAVATIONA. Excavate to lines
- Page 65 and 66:
C. Make excavation large enough to
- Page 67 and 68:
3. After receipt of the written req
- Page 69 and 70:
D. Observe following trenching crit
- Page 71 and 72:
1. Under roadway crossings or pavem
- Page 73 and 74:
END OF SECTION02332-2WATERING
- Page 75 and 76:
A. Preparation: Install soil retent
- Page 77 and 78:
PART 3 EXECUTION3 .1 MARKING TAPEA.
- Page 79 and 80:
3.2 PERMANENT PAVEMENT REPLACEMENTA
- Page 81 and 82:
B. Cutting Existing Pavement: Contr
- Page 83 and 84:
SECTION 02725AGGREGATE BASE COURSEP
- Page 85 and 86:
B. Width: Plan dimension, plus or m
- Page 87 and 88:
B. Job-Mix Formula: Before producin
- Page 89 and 90:
2. The paver shall be equipped with
- Page 91 and 92:
C. A uniform compacted thickness sh
- Page 93 and 94:
2 .3 VINYL COATED POSTSA. Steel Pip
- Page 95 and 96:
E. Gate Hardware: Set keepers, stop
- Page 97 and 98:
SECTION 02855BOLLARDSPART 1 GENERAL
- Page 99 and 100:
SECTION 03300CAST-IN-PLACE CONCRETE
- Page 101 and 102:
1.4 SUBMITTALSA. Shop Drawings:1. A
- Page 103 and 104:
C. Chairs, Bolsters, Bar Supports,
- Page 105 and 106:
2.7 SLEEVESA. Unless noted otherwis
- Page 107 and 108:
C. Placement: Place reinforcement a
- Page 109 and 110:
B. Non-supporting forms (sides of c
- Page 111 and 112:
3.11 DAMAGED OR DEFECTIVE CONCRETEA
- Page 113 and 114:
B. Fine and coarse Aggregates1. Agg
- Page 115 and 116:
B. Mixing and Delivery1. Conform to
- Page 117 and 118:
SECTION 09900PAINTINGPART 1 - GENER
- Page 119 and 120:
B. Protect from freezing or damage.
- Page 121 and 122:
4. Remove by brush, air blast, or v
- Page 123 and 124:
Q. Assure hardware and accessories,
- Page 125 and 126:
SECTION 15050BASIC MATERIALS AND ME
- Page 127 and 128:
A. General: Provide adjustable pipe
- Page 129 and 130:
PIPE TYPEPIPE SIZE (INCHES)MAXIMUMS
- Page 131 and 132:
SECTION 15060PIPE AND PIPE FITTINGS
- Page 133 and 134:
1.6 DELIVERY, STORAGE, AND HANDLING
- Page 135 and 136: B. Enter and exit through structure
- Page 137 and 138: F. Prior to exposing the connection
- Page 139 and 140: 5. After required contact period, d
- Page 141 and 142: PART 2 - PRODUCTS2.1 MANUFACTURERSA
- Page 143 and 144: 3.2 PREPARATIONA. Correct defects o
- Page 145 and 146: SECTION 15064PIPE: PLASTIC (PVC) PR
- Page 147 and 148: PART 3 - EXECUTION3.01 EXAMINATIONA
- Page 149 and 150: 3.05 CLEANINGA. Clean in accordance
- Page 151 and 152: 2 .2 ISOLATION HANGERSA. General: F
- Page 153 and 154: H. Pipe: Provide seismic restraint
- Page 155 and 156: A. Engraved anodized aluminum or en
- Page 157 and 158: END OF SECTION15075-4MECHANICAL IDE
- Page 159 and 160: B. Storage: Do not store materials
- Page 161 and 162: equirements of 400 degrees Fahrenhe
- Page 163 and 164: SECTION 15090PIPE SUPPORT SYSTEMSPA
- Page 165 and 166: 3.4 SCHEDULEA. General: Locate pipe
- Page 167 and 168: C. Operation and Maintenance Manual
- Page 169 and 170: SECTION 15101GATE VALVESPART 1 - GE
- Page 171 and 172: 3.4 FIELD QUALITY CONTROLA. Repair
- Page 173 and 174: K. Products as manufactured by G.A.
- Page 175 and 176: 2.07 SILENT CHECKA. Ductile iron or
- Page 177 and 178: SECTION 15114SPECIAL VALVESPART 1 -
- Page 179 and 180: SECTION 15130PUMPSPART 1 GENERAL1 .
- Page 181 and 182: B. Install pumps in accordance with
- Page 183 and 184: F. Mount the remote meter display o
- Page 185: A. Cap all openings in pipes and va
- Page 189 and 190: 3 .2 PIPE INSTALLATIONA. Clean all
- Page 191 and 192: d. If the meter test hand moves, ex
- Page 193 and 194: SECTION 15400PLUMBING SYSTEMSPART 1
- Page 195 and 196: 2 .7 PIPE SLEEVESA. As specified in
- Page 197 and 198: A. As specified in Section 15050.3
- Page 199 and 200: 3. Welders whose qualifications hav
- Page 201 and 202: 2) Gaskets: ASME B16.21-92. Gaskets
- Page 203 and 204: B. Tank shall be grit-blasted, prim
- Page 205 and 206: G. Internal Valves: 400-psi WOG, 15
- Page 207 and 208: B. Provide angle iron pipe supports
- Page 209 and 210: position. All propane system valves
- Page 211 and 212: 4. Pipe supports5. Bollards (see Se
- Page 213 and 214: 11. Include scale range, ratings, c
- Page 215 and 216: F. Safety Relief Valves: Brass or b
- Page 217 and 218: PART 3 EXECUTION3 .1 PIPE APPLICATI
- Page 219 and 220: B. Install thermometer wells in ver
- Page 221 and 222: 1. Location of automatic and manual
- Page 223 and 224: venting and sealed combustion. Insu
- Page 225 and 226: F. Automatic high limit shall shut
- Page 227 and 228: B. Filters: 1-inch thick pleated, 2
- Page 229 and 230: 4. Interconnection wiring diagrams
- Page 231 and 232: C. Electronic Operators: Operator s
- Page 233 and 234: A. Install a pressure gauge adjacen
- Page 235 and 236: B. Demonstrate complete system oper
- Page 237 and 238:
B. Contractor shall furnish for app
- Page 239 and 240:
A. General: Conduct tests in the pr
- Page 241 and 242:
4. Materials and equipment shall be
- Page 243 and 244:
3 .3 DEMONSTRATIONA. As specified i
- Page 245 and 246:
3. Raceways at vibrating equipment
- Page 247 and 248:
A. Electrical Cabinet shall be NEMA
- Page 249 and 250:
3 .7 TRANSIENT VOLTAGE PROTECTIONA.
- Page 251 and 252:
3 .2 GROUND RINGA. Install conducto
- Page 253 and 254:
SECTION 16131ELECTRICAL PULLBOXESPA
- Page 255 and 256:
SECTION 16210ELECTRIC SERVICEPART 1
- Page 257 and 258:
SECTION 16401UNDERGROUND SECONDARYP
- Page 259 and 260:
PART 3 EXECUTION3 .1 EXTENSIONS INT
- Page 261 and 262:
3.2 INSTRUMENT CALIBRATIONA. The co
- Page 263 and 264:
protected as recommended by the equ