A. Set precast pullboxes on 6 inches of level, 90-percent compacted crushed rock, 3/4-inch to 1-inchsize, extending 12 inches on each side beyond edges of pullboxes.B. Set precast pullbox sections in grout, making watertight joints.C. Install top of pullboxes flush with adjacent soil or 1/4” below grade in paved areas.3 .4 CONDUITA. Terminate conduits entering pullboxes flush with interior walls, with bell shaped fittings for2-inch and larger conduit and bushings for conduit smaller than 2 inches. Grout in around allconduit entries.B. Provide explosion proof sealoff fittings on conduits terminating in pullboxes that originate fromClass 1, Division1 or Class 1, Division 2 locations.PART 4 MEASUREMENT AND PAYMENT4 .1 EL<strong>EC</strong>TRICAL PULLBOXESA. Payment will be included in the bid items to which this work relates.END OF S<strong>EC</strong>TION16131-2EL<strong>EC</strong>TRICAL PULLBOXES

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!