PART 3 EX<strong>EC</strong>UTION3 .1 EXTENSIONS INTO EQUIPMENTA. Extend conduit wires and cables into packaged equipment at locations shown. Provide allconnections required.3 .2 CONDUITA. Section 16050.3 .3 PULLBOXESA. Section 16050.3.4 CABLE INSP<strong>EC</strong>TIONA. Carefully inspect cable during handling to verify that the cable is free from visible defects. Reportall cable damage to Contracting Officer, whether prior to installation, during installation, ordiscovered by test. Repair cable promptly, as recommended by manufacturer and as approved byContracting Officer.3 .4 CABLE SLACK AND BENDSA. Leave minimum 24 inches of excess cable at all risers, transformer pads, pedestals, andtermination points.B. The minimum acceptable bending radius, measured to the surface of the cable on the inside of thebend, is 12 times the overall diameter of the cable. No cable bends shall be made within 12 inchesof a splice or termination.3 .5 CABLE SPLICESA. Make splices in accordance with the splice connector manufacturer's instructions.B. Not more than one splice will be permitted for each 2,000 feet of cable installed unless authorizedby Contracting Officer.C. Show exact location of all splices on project record drawings.3 .6 TRENCHING AND BACKFILLINGA. Section 02221.END OF S<strong>EC</strong>TION16401-305/08 UNDERGROUND S<strong>EC</strong>ONDARY

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!