D. In floors containing floor drains, extend floor sleeves 2 inches above finished floor.3 .6 ESCUTCHEONSA. Install escutcheons where pipes pass through walls, floors, or ceilings in finished areas. Installnickel-plated escutcheons in finished areas after painting is completed. Paint escutcheons inunfinished areas after painting of surface is completed. Firmly secure escutcheons to uninsulatedpipes with set screws.3 .7 SEALANTSA. Penetrations in floors, mechanical room walls, and other fire wall construction shall be closed andsealed with firestopping material.B. The annular space between exposed pipe or ductwork and walls or floors shall be filled, sealed,and painted to match adjacent surfaces.3 .8 CLEANINGA. Remove foreign materials including dirt, grease, and splashed paint. Restore damaged finishes ofequipment to original condition.3 .9 PAINTINGA. Section 09901. Paint all new mechanical work and touch up previously painted surfaces whereexposed in finished areas or exterior to the building.3 .10 PRELIMINARY OPERATIONA. Operate any portion of installation if requested. Such operation does not constitute acceptance ofwork as complete.PART 4 MEASUREMENT AND PAYMENT4 .1 BASIC MATERIALS AND METHODSA. Payment will be included in the bid item to which this work relates.END OF S<strong>EC</strong>TION15050-6BASIC MATERIALS AND METHODS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!