12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4. Pipe supports5. Bollards (see Section 02855)6. All aboveground LP-gas pipingB. Items that shall not be field painted include the following:1. Tank and equipment identification plates2. Tank fittings, valves, valve actuators, and regulators3. Pneumatic control piping4. Flexible piping connectors3 .14 M<strong>EC</strong>HANICAL IDENTIFICATIONA. Identify all valves, piping, and controls in accordance with Section 15075.3 .15 START-UP/TRAININGA. As specified in Section 01815.B. Provide four hours of operating and maintenance instruction to Government personnel and otherswho will be responsible for operating the propane system. The Contracting Officer shall benotified at least 48 hours prior to proposed start-up or training, and the time chosen for the start-upand/or training shall be mutually agreeable.PART 4 MEASUREMENT AND PAYMENT4 .1 PROPANE GAS STORAGE SYSTEM AND APPURTENANCESA. Payment will be included in the bid item to which this work relates.END OF S<strong>EC</strong>TION15480-14PROPANE GAS STORAGE SYSTEM AND APPURTENANCES

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!