12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1. Install new 9,200 gallon propane tank to include bulk fill and all supply lines to the shopsand storage buildings.2. Install all building interior pipe from exterior trench to mechanical room boilers.3. Install new 1,000 gallon tank to include trenching and pipe to generator room.4. Replace both boilers.5. Replace the generator.6. Remove and remediate 4,000 gallon heating oil tanks.7. Install steel cover over gas/diesel tanks – bid option #1.8. Owner training & close out1 .3 CONTRACTOR'S USE OF PREMISESA. Construction Camp: Establishment of a camp within the park will not be permitted.B. Trailer pads may be available for use by contractor during construction.C. Contractor shall conduct operations to ensure the least inconvenience to the public. Contractorshall not close access to the park during construction.D. Confine placement of temporary offices, and storage of material, machinery, and miscellaneousequipment to the area designated on the construction drawings. Materials and machinery shall notbe stored in any other location within the park unless authorized by the Contracting Officer.E. Preservation of Natural Features: Confine all operations to work limits of the project. Preventdamage to natural surroundings. Restore areas that have been damaged as a result of constructionactivity, repairing or replacing damaged trees and plants, at no additional expense to theGovernment.1. Provide temporary barriers to protect existing trees, plants, and root zones.2. Do not remove, injure, or destroy trees or other plants without prior approval. Consultwith Contracting Officer and remove agreed-on roots and branches that interfere withconstruction.3. Tree roots greater than 4-inches in diameter shall be trenched under and left unaffectedby water line construction.4. Do not fasten ropes, cables, or guys to existing trees.5. Carefully supervise excavating, grading, filling, and other construction operations neartrees to prevent damage.F. Existing Utilities: Notify Contracting Officer of proposed locations and times for excavation.1. Contractor shall be responsible for locating and preventing damage to known utilities. Ifdamage occurs, repair utility at no additional expense to the Government.01110-212/09 SUMMARY OF WORK

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!