12.07.2015 Views

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

DIVISION 1 - GENERAL REQUIREMENTS - IDEAS-EC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

A. Section 03300.2 .21 PAINTA. Section 09901.B. Paint Color: Finish paint color shall be in the tan color range to match the adjacent buildings.Contracting Officer shall select and approve finish paint color.PART 3 EX<strong>EC</strong>UTION3 .1 <strong>GENERAL</strong>A. Install propane liquid and gas (vapor) storage systems and equipment in conformance with theinstallation and service guidebooks prepared by the National Propane Gas Association (NPGA).Complete all work in compliance with NFPA 54-96 and NFPA 58-95.3 .2 STORAGE TANK INSTALLATIONA. Install tanks on concrete foundations as shown on the drawings with 1/2-inch insulating materialbetween the tank and the foundation piers. Anchor tanks to foundations using seismic restraintflanges attached to tanks. Provide internal valves or excess flow valves at all liquid connections toprevent escape of LP-gas in the event of piping damage or failure. Tanks shall be grounded asshown on the drawings. If tanks have been damaged during delivery, they shall not be installed;they shall be returned to the manufacturer and replaced with undamaged tanks at no additionalcost to the Government.3 .3 LP-GAS DISPENSER (BID ADDITIVE B)A. Lp-gas dispenser shall be installed in accordance with the manufacturer’s recommendations.Provide a concrete mounting pad for the lp-gas dispenser. Fasten base of lp-gas dispenser cabinetsecurely to the concrete pad with anchor bolts.3 .4 TRANSPORT UNLOADING BULKHEADA. Bulkhead shall be installed in accordance with approved shop drawings in the location shown onthe drawings. Connect pneumatic release operator for emergency shutoff valve to the pneumaticcontrol system as shown on the drawings.3 .5 PNEUMATIC CONTROL SYSTEM INSTALLATIONA. General: Install pneumatic control system as shown on the drawings. Pneumatic control valvesshall be mounted in enclosures or panels as specified. Provide supports with concrete padfoundations at grade for those valves or other pneumatic control system components that are notattached to bollards, mounted in other equipment, or mounted in other enclosures.B. Nitrogen Cylinders and Cabinet: Provide a concrete mounting pad for the nitrogen cylindercabinet. Fasten base of nitrogen cylinder cabinet securely to the concrete pad with anchor bolts.3 .6 PNEUMATIC CONTROL SYSTEM SEQUENCE OF OPERATIONA. Emergency Shutdown Valves: During normal operation, pressurized nitrogen in the pneumaticcontrol system shall maintain the propane system valves with pneumatic actuators in the open15480-11PROPANE GAS STORAGE SYSTEM AND APPURTENANCES

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!